Planning application
23 Thorn Park Plymouth PL3 4TD
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition and replacement of single storey rear extension
As published by the council, reference 19/01776/PRDE
Application record
- Reference
- 19/01776/PRDE
- Type
- LDC Proposed Development
- Status
- Decided
- Decision
- Granted As published: Issue lawful certificate (Proposed)
- Received
- 7 Nov 2019
- Validated
- 13 Nov 2019
- Decided
- 20 Nov 2019
- Ward
- COMPTON
- Decision by
- Delegated Decision
- Postcode
- PL3 4TD
Site history
Applications at this address on the Plymouth register
This site has had 2 applications since 2019: 2 approved, 0 refused.
-
26/00668/TCO Granted
23 Thorn Park Plymouth PL3 4TD
T1 - Cedar - Reduce in height to previous points leaving the tree stranding at 6m. T2 - Mimosa - Reduce entire canopy leaving the tree standing at 4m.
Timeline
Dates from the published record
-
7 Nov 2019
Received by Plymouth
-
13 Nov 2019
Validated
Checked as complete and ready for consideration.
-
20 Nov 2019
Decision issued: Issue lawful certificate (Proposed)
-
22 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Plymouth granted permission on 20 November 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
23 Thorn Park Plymouth PL3 4TD
T1 - Cedar - Reduce in height to previous points leaving the tree stranding at 6m. T2 - Mimosa - Reduce entire canopy leaving the tree standing at 4m.
Granted Trees 4 docs -
-
91 Mannamead Road Plymouth PL3 4SX
T1 - Beech - Reduce tree in height by 3-4m and sides by 2-3m.
Granted Trees 5 docs -
97 Mannamead Road Plymouth PL3 4SX
Proposed demolition of garage and construction of replacement storage building with first floor games room, gym and shower room. Re-application of the approved scheme 16/00606/FUL.
Granted Full applications Demolition 18 docs -
97 Mannamead Road Plymouth PL3 4SX
Condition Discharge: Condition 4 of application 20/00491/FUL
Granted Conditions 8 docs -
97 Mannamead Road Plymouth PL3 4SX
Installation of replacement vehicular gate
Granted Full applications 15 docs
Other outline applications
In Plymouth
-
26/01236/MOR Awaiting decision
33 - 37 New George Street Plymouth PL1 1RA
Pre-application for new residential entrance to upper floors
-
26/01213/PRDE Awaiting decision
13 Torland Road Plymouth PL3 5TS
Replacement single storey side garage
-
26/01205/MOR Awaiting decision
54 Stuart Road Plymouth PL3 4EE
Pre-application for extension of a bed and breakfast building to increase bedroom numbers
-
26/01181/PRDE Awaiting decision
9 Lands Park Plymouth PL9 9BY
Single storey side extension and single storey rear extension
-
26/01178/MOR Awaiting decision
906 Wolseley Road Plymouth PL5 1LA
Pre-application for erection of a dwelling