Skip to content
PlanIndex Get alerts
Menu

Planning application

Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

Granted Plymouth 19/01143/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of a spray booth's ventilation duct and associated mechanical and electrical services

As published by the council, reference 19/01143/LBC

Application record

Reference
19/01143/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Grant Conditionally
Received
12 Jul 2019
Validated
21 Aug 2019
Decided
23 Oct 2019
Ward
DEVONPORT
Decision by
Delegated Decision
Postcode
PL1 4SG

Site history

Applications at this address on the Plymouth register

This site has had 31 applications since 2018: 23 approved, 0 refused.

  • 26/01435/LBC Awaiting decision

    Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Removal of existing cast iron suction pipe assembly within the West Main Dock Pump Well and for the development of future replacement pumping infrastructure

    Submitted 14 Oct 2026 Heritage and listed buildings
  • 26/01406/FUL Awaiting decision

    Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Replacement of existing entrance and fire exit doors to Building M055 (No. 8 Store), Devonport Dockyard.

    Submitted 8 Oct 2026 Full applications
  • 26/01407/LBC Awaiting decision

    Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Replacement of existing entrance and fire exit doors to Building M055 (No. 8 Store), Devonport Dockyard.

    Submitted 8 Oct 2026 Heritage and listed buildings
  • 26/01169/FUL Awaiting decision

    Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Retention of 4no modular buildings for use as offices

    Submitted 19 Aug 2026 Full applications
  • 26/01082/FUL Awaiting decision

    Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Demolition of buildings; and associated structural works, excavation of ground and backfilling of excavated area.

    Submitted 3 Aug 2026 Full applications
  • 26/00805/CDM Granted

    Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Condition Discharge: Condition 6 (External Materials) of application 19/01904/FUL

    Decided 27 Jul 2026
  • 26/00720/FUL Awaiting decision

    Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Roof and wall replacement to Building S154 (part retrospective)

    Submitted 21 May 2026 Full applications
  • 26/00707/MOR Awaiting decision

    Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Pre-application for channelled timber beam extending from front to back along the top, part of a former all-wood traveller." The above beams are rotting where they bear on the external walls. We would like some advice on what repair options we have.

    Submitted 20 May 2026 Outline
  • 26/00570/S73 Granted

    Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Variation of Conditions 1 (Approved Plans), 4 (Drainage Details), and 5 (Cycle Provision) of approved application 25/01220/FUL

    Decided 23 Jul 2026 Amendments
  • 26/00074/CDM Awaiting decision

    Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Condition Discharge: Condition 4 (Archaelogical Evaluation (Test Pits) And Mitigation) and Condition 6 (Archaelogical Building Recording) of application 24/01217/FUL

    Submitted 15 Jan 2026 Conditions

Timeline

Dates from the published record

  1. 12 Jul 2019

    Received by Plymouth

  2. 21 Aug 2019

    Validated

    Checked as complete and ready for consideration.

  3. 23 Oct 2019

    Decision issued: Grant Conditionally

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Plymouth granted permission on 23 October 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Plymouth

  • 26/01470/LBC Awaiting decision

    Saltram House, Saltram Merafield Road Plymouth PL7 1UH

    Relocation and rehanging of the historic eastern door from the Chinese Bedroom within the South Bedrooms enfilade, together with targeted structural strengthening of the first-floor timber structure beneath the partition between the Green Dressing Room and Lord Morley's Room

    Received 22 Oct, published by the council 23 Oct 2026 Heritage and listed buildings
  • 26/01198/LBC Granted

    1 Berkeley Cottages Collingwood Road Plymouth PL1 5QT

    Replacement roof covering (part retrospective) and associated works

    Received 26 Aug, published by the council 28 Aug 2026 Heritage and listed buildings
  • 26/01435/LBC Awaiting decision

    Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Removal of existing cast iron suction pipe assembly within the West Main Dock Pump Well and for the development of future replacement pumping infrastructure

    Received 14 Oct, published by the council 19 Oct 2026 Heritage and listed buildings
  • 26/01061/LBC Decided

    76 Durnford Street Plymouth PL1 3QW

    Removal and reinstatement of slates from rear bay windows for investigation works

    Received 28 Jul, published by the council 5 Aug 2026 Heritage and listed buildings
  • 26/00308/LBC Decided

    Building N186, Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Internal works to form office and ancillary accommodation plus supporting external works including the installation of a ground mounted condenser unit

    Received 2 Mar, published by the council 26 Jul 2026 Heritage and listed buildings