Planning application
15 Wycliffe Road Plymouth PL3 6BZ
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed extension and alterations
As published by the council, reference 19/01035/FUL
Application record
- Reference
- 19/01035/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 26 Jun 2019
- Validated
- 27 Jun 2019
- Decided
- 16 Aug 2019
- Ward
- EFFORD AND LIPSON
- Decision by
- Delegated Decision
- Postcode
- PL3 6BZ
Timeline
Dates from the published record
-
26 Jun 2019
Received by Plymouth
-
27 Jun 2019
Validated
Checked as complete and ready for consideration.
-
16 Aug 2019
Decision issued: Grant Conditionally
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
41 applications on PlanIndex · across 3 councils · 90% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
4 Castle Rise Plymouth PL3 6BH
Proposed parking bay and raised decking
Granted Full applications 10 docs -
4 Castle Rise Plymouth PL3 6BH
Proposed parking bay and raised decking
Granted Full applications 10 docs -
Land To The Rear Of 127 Old Laira Road Plymouth PL3 6BN
Demolition of garages and construction of detached dwelling with parking and amenity space
Granted Full applications New dwelling Demolition 26 docsDomestic -
23 Hanover Road Plymouth PL3 6BY
Single storey rear extension inc. replacing existing kitchen pitched roof with flat roof and amended access
Withdrawn Outline Extension 9 docsSmall domestic -
1A Western Drive Plymouth PL3 6BQ
Wooden fence measuring 0.9m high and 24m long on boundary wall.
Granted Full applications 9 docsSmall domestic -
Land Immediately North Of Riga Terrace Plymouth
Pre-application for 8 dwellings.
Decided Outline 9 docsSeveral homes
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works
-
26/01197/FUL Awaiting decision
51 Emma Place Plymouth PL1 3QU
Installation of EV charger to facilitate pavement channel charging