Planning application
78 Durnford Street Plymouth PL1 3QW
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of summerhouse
As published by the council, reference 19/00776/FUL
Application record
- Reference
- 19/00776/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 14 May 2019
- Validated
- 30 May 2019
- Decided
- 24 Jul 2019
- Ward
- ST PETER AND THE WATERFRONT
- Decision by
- Delegated Decision
- Postcode
- PL1 3QW
Timeline
Dates from the published record
-
14 May 2019
Received by Plymouth
-
30 May 2019
Validated
Checked as complete and ready for consideration.
-
24 Jul 2019
Decision issued: Grant Conditionally
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
78 Durnford Street Plymouth PL1 3QW
Erection of summerhouse
Granted Heritage and listed buildings 13 docs -
76 Durnford Street Plymouth PL1 3QW
Pre-application for removal of slates from bay window to rear elevation to carry out investigative work
Decided Outline Windows or glazing 3 docs -
Lower Ground Floor Flat, 72 Durnford Street Plymouth PL1 3QW
Replacement rear external door
Granted Heritage and listed buildings 9 docs -
86 Durnford Street Plymouth PL1 3QW
Extension of rear balcony with stairs and internal alterations
Granted Heritage and listed buildings Extension 17 docs -
76 Durnford Street Plymouth PL1 3QW
100% historically approved · decision due ~22 Sep
Removal and reinstatement of slates from rear bay windows for investigation works
Awaiting decision Heritage and listed buildings Windows or glazing 11 docs -
90 Durnford Street Plymouth PL1 3QW
Pre-application for the re-construction of garage and provision of self-contained accommodation above
Decided Outline 5 docs
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works
-
26/01197/FUL Awaiting decision
51 Emma Place Plymouth PL1 3QU
Installation of EV charger to facilitate pavement channel charging