Planning application
61 Molesworth Road Stoke Plymouth PL1 5PF
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey extension and alterations, demolition of a single storey extension.
As published by the council, reference 19/00686/FUL
Application record
- Reference
- 19/00686/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 29 Apr 2019
- Validated
- 3 May 2019
- Decided
- 6 Jun 2019
- Ward
- STOKE
- Decision by
- Delegated Decision
- Postcode
- PL1 5PF
Timeline
Dates from the published record
-
29 Apr 2019
Received by Plymouth
-
3 May 2019
Validated
Checked as complete and ready for consideration.
-
6 Jun 2019
Decision issued: Grant Conditionally
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Berkeley
23 applications on PlanIndex · across 13 councils · 95% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
61 Molesworth Road Stoke Plymouth PL1 5PF
Single storey extension and alterations, demolition of a single storey extension
Granted Heritage and listed buildings Extension Demolition 16 docsSmall domestic -
61 Molesworth Road Stoke Plymouth PL1 5PF
2no. air conditioning units (part retrospective)
Granted Full applications 13 docs -
61 Molesworth Road Stoke Plymouth PL1 5PF
2no. air conditioning units (part retrospective)
Granted Heritage and listed buildings 11 docs -
274 Stuart Road Plymouth PL1 5PQ
Willow, Christmas tree and Pittisporum (dead) - reduce to 2 feet high. Unknown Tree - reduce branches overhanging garden of 272 Stuart Road.
Granted Trees 3 docs -
274 Stuart Road Plymouth PL1 5PQ
T1 Beech reduce leaving the tree with an approximate finish heigh of 6m and 4m wide. T2 Cedar reduce single leader leaving a finished height of proximately 4m. T3 Apple tree re-prune to previous reduction points leaving finished height of 3m and a width of 4m.
Granted Trees 4 docs -
Paviland Grange 44 Valletort Road Plymouth PL1 5PN
Lime (03) - crown lift to 3m above pavement and 3 low branches over bench. Ash (06) - crown lift to 5m above ground level over car park and 5m over entrance drive. Alder (08) -crown lift to 5m above ground level over car park. Lime (09) - crown lift to 5m above ground level over car park and 1m from sub station Ash (10) - crown lift to 5m above ground level over car park. Wild Cherrry (17) - tip prune to clear building. G1 - pruning of overhanging branches of Eucalyptus, Apple and Bay back to boundary to natural growth points.
Granted Trees 5 docs
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works
-
26/01197/FUL Awaiting decision
51 Emma Place Plymouth PL1 3QU
Installation of EV charger to facilitate pavement channel charging