Planning application

63 Aylesbury Crescent Plymouth PL5 4HX

Granted Plymouth 19/00389/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Two-storey side extension and front porch

As published by the council, reference 19/00389/FUL

Application record

Reference
19/00389/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
12 Mar 2019
Validated
27 Mar 2019
Decided
22 May 2019
Ward
BUDSHEAD
Decision by
Delegated Decision
Postcode
PL5 4HX

Timeline

Dates from the published record

  1. 12 Mar 2019

    Received by Plymouth

  2. 27 Mar 2019

    Validated

    Checked as complete and ready for consideration.

  3. 22 May 2019

    Decision issued: Grant Conditionally

  4. 1 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

1 application on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Mellstock Milford Lane Plymouth PL5 4LU

    19/00701/FUL Submitted 1 May 2019 161m away

    Single storey side extension

    Withdrawn Full applications Extension 9 docs
    Small domestic
  • 198 Taunton Avenue Plymouth PL5 4EP

    22/02010/FUL Submitted 6 Dec 2022 184m away

    Front bike store

    Refused Full applications 15 docs
  • 121 Aylesbury Crescent Plymouth PL5 4HX

    20/00309/GP1 Submitted 24 Feb 2020 242m away

    A single-storey rear extension which extends beyond the rear wall of the original dwellinghouse by 4.0m, has a maximum height of 3.6m to ridge and has an eaves height of 2.6m.

    Granted Householder Extension 2 docs
    Small domestic
  • 168 Taunton Avenue Plymouth PL5 4ER

    18/01201/FUL Submitted 9 Jul 2018 253m away

    Rear extension, first floor side extension, front and rear loft conversion, front porch and alterations to hardstanding

    Refused Full applications Extension Loft or dormer 8 docs
    Small domestic
  • 31 Brentford Avenue Plymouth PL5 4HB

    23/00299/GP1 Submitted 1 Mar 2023 260m away

    A single-storey rear extension which extends beyond the rear wall of the original dwellinghouse by 4.50m, has a maximum height of 2.75m, and has an eaves height of 2.40m

    Granted Householder Extension 11 docs
    Small domestic
  • 89 Brentford Avenue Plymouth PL5 4HD

    25/01257/FUL Submitted 25 Sep 2025 268m away

    Creation of off-street car parking, with associated partial removal of embankment and construction of retaining walls, and new black metal railings, plus associated landscaping.

    Refused Full applications 15 docs

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications