Planning application
56 Lanhydrock Road Plymouth PL4 9HG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Conversion of existing rear double garage into an annex
As published by the council, reference 19/00141/FUL
Application record
- Reference
- 19/00141/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 1 Feb 2019
- Validated
- 4 Feb 2019
- Decided
- 29 Mar 2019
- Ward
- SUTTON AND MOUNT GOULD
- Decision by
- Delegated Decision
- Postcode
- PL4 9HG
Timeline
Dates from the published record
-
1 Feb 2019
Received by Plymouth
-
4 Feb 2019
Validated
Checked as complete and ready for consideration.
-
29 Mar 2019
Decision issued: Grant Conditionally
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
18 applications on PlanIndex · across 2 councils · 93% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Domestic
-
2 Mount Gould Avenue Plymouth PL4 9EZ
Front extension, alterations to fenestrations, front velux rooflight, rear raised access stairs
Granted Full applications Extension Loft or dormer 16 docs -
2 Mount Gould Avenue Plymouth PL4 9EZ
Multiple alterations including a porch extension, rooflights, alterations to windows and doors, and a boundary fence
Decided Outline Extension Loft or dormer +1 14 docsSmall domestic -
-
248 Beaumont Road Plymouth PL4 9EQ
Decking to the rear of the property, to cover the width of the house, circa 3.6 metres, and extend to the rear wall of the garden, maximum 4.5 metres.
Granted Full applications 17 docs -
31 Mount Gould Avenue Plymouth PL4 9HA
Part single and part two storey rear extension.
Granted Full applications Extension 13 docs
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works
-
26/01197/FUL Awaiting decision
51 Emma Place Plymouth PL1 3QU
Installation of EV charger to facilitate pavement channel charging