Planning application
111 Plymstock Road Plymouth PL9 7PH
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey rear extension
As published by the council, reference 19/00041/FUL
Application record
- Reference
- 19/00041/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 14 Jan 2019
- Validated
- 17 Jan 2019
- Decided
- 19 Feb 2019
- Ward
- PLYMSTOCK RADFORD
- Decision by
- Delegated Decision
- Postcode
- PL9 7PH
Timeline
Dates from the published record
-
14 Jan 2019
Received by Plymouth
-
17 Jan 2019
Validated
Checked as complete and ready for consideration.
-
19 Feb 2019
Decision issued: Grant Conditionally
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
98 Plymstock Road Plymouth PL9 7PJ
93% historically approved · decision due ~9 Jul
Alterations and extension to existing detached garage to create new annex
Awaiting decision Full applications Extension -
121 Plymstock Road Plymouth PL9 7PH
Pre-application for rear extension inc. demolition of existing lean too
Decided Householder Extension Demolition 6 docsDomestic -
2 Lawson Grove Plymouth PL9 7QJ
Single story boat store/garage sited on existing hard standing
Granted Full applications 12 docs -
90 - 92 Plymstock Road Plymouth PL9 7PJ
Change of use from part of residential care home (Class C2) to single dwelling (Class C3); inc. partial demolition of glazed link between 90 and 92 Plymstock Road, construction of garage/turntable, erection of rear balcony and raised rear patio, and alterations to building elevations and fencing (resubmission of application 22/00451/FUL)
Refused Full applications Demolition Windows or glazing 25 docsDomestic -
8 Birch Pond Road Plymouth PL9 7PG
Single storey rear extension and first floor rear balcony (part retrospective)
Granted Full applications Extension 31 docsSmall domestic -
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works
-
26/01197/FUL Awaiting decision
51 Emma Place Plymouth PL1 3QU
Installation of EV charger to facilitate pavement channel charging