Skip to content
PlanIndex Get alerts
Menu

Planning application

77 Underlane Plymstock Plymouth PL9 9LA

Granted Plymouth 18/02146/FUL Full Application

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Hip to gable roof conversion and raising of roof height, front porch, two-storey rear extension with balcony and raised decking.

As published by the council, reference 18/02146/FUL

Application record

Reference
18/02146/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
31 Dec 2018
Validated
2 Jan 2019
Decided
26 Feb 2019
Ward
PLYMSTOCK RADFORD
Decision by
Delegated Decision
Postcode
PL9 9LA

Timeline

Dates from the published record

  1. 31 Dec 2018

    Received by Plymouth

  2. 2 Jan 2019

    Validated

    Checked as complete and ready for consideration.

  3. 26 Feb 2019

    Decision issued: Grant Conditionally

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 77 Underlane Plymstock Plymouth PL9 9LA

    20/00307/FUL Submitted 25 Feb 2020 0m away

    Raise roof height, front porch, two-storey rear extension with balcony and raised decking (amendments to approval 18/02146/FUL to remove gable roof)

    Granted Full applications Extension 11 docs
    Small domestic
  • 77 Underlane Plymstock Plymouth PL9 9LA

    21/01189/AMD Submitted 28 Jun 2021 0m away

    Non-material Amendment: Extend existing facia and soffits, relocate balcony doors and change colour of ridge tiles of application 20/00307/FUL

    Decided Amendments 4 docs
  • 79 Underlane Plymstock Plymouth PL9 9LA

    17/02231/FUL Submitted 15 Nov 2017 19m away

    Two storey rear and side extension and lower ground floor extension form 'granny annexe'

    Granted Full applications Extension 11 docs
  • 75 Underlane Plymstock Plymouth PL9 9LA

    19/00305/FUL Submitted 28 Feb 2019 39m away

    Side dormer

    Granted Full applications Loft or dormer 6 docs
  • 81 Underlane Plymstock Plymouth PL9 9LA

    18/02039/FUL Submitted 3 Dec 2018 40m away

    Extension to existing detached garage for use as storage

    Granted Full applications Extension 12 docs
  • 63 Underlane Plymstock Plymouth PL9 9LA

    21/01018/FUL Submitted 1 Jun 2021 79m away

    Single storey rear extension with retained replacement raised patio/terrace area inc. demolition of existing rear extension (re-submission of 21/00137/FUL)

    Granted Full applications Extension Demolition 13 docs
    Small domestic

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications