Planning application
10 Thornyville Drive Plymouth PL9 7LF
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Two-storey side extension
As published by the council, reference 18/02018/FUL
Application record
- Reference
- 18/02018/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 29 Nov 2018
- Validated
- 3 Dec 2018
- Decided
- 22 Jan 2019
- Ward
- PLYMSTOCK RADFORD
- Decision by
- Delegated Decision
- Postcode
- PL9 7LF
Timeline
Dates from the published record
-
29 Nov 2018
Received by Plymouth
-
3 Dec 2018
Validated
Checked as complete and ready for consideration.
-
22 Jan 2019
Decision issued: Grant Conditionally
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Plymouth
41 applications on PlanIndex · 95% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
8 Thornyville Drive Plymouth PL9 7LF
Proposed loft conversion including a rear dormer and front rooflights
Granted Full applications Loft or dormer 13 docs -
6 Lawson Grove Plymouth PL9 7QJ
Single storey rear extension and alterations to ramp and decking
Granted Full applications Extension 8 docsSmall domestic -
37 Thornyville Villas Plymouth PL9 7LB
First floor side extension, roof alterations and loft conversion, rear conservatory, rear summerhouse and replacement garage roof
Granted Full applications Extension Loft or dormer +1 66 docs -
St Ronans Longlands Road Plymouth PL9 7RW
Single storey side extension
Granted Full applications Extension 10 docsSmall domestic -
19 Longlands Road Plymouth PL9 7RW
Side extension to form single vehicle garage with new gym
Granted Full applications Extension 10 docs -
2 Lawson Grove Plymouth PL9 7QJ
Single story boat store/garage sited on existing hard standing
Granted Full applications 12 docs
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works
-
26/01197/FUL Awaiting decision
51 Emma Place Plymouth PL1 3QU
Installation of EV charger to facilitate pavement channel charging