Skip to content
PlanIndex Get alerts
Menu

Planning application

Residential Blocks Frankfort Gate (East End Gables)

Granted Plymouth 18/01941/FUL Full Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of existing concrete panels and windows and installation of new cladding panels and windows.

As published by the council, reference 18/01941/FUL

Application record

Reference
18/01941/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
13 Nov 2018
Validated
16 Nov 2018
Decided
10 Jan 2019
Ward
ST PETER AND THE WATERFRONT
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 13 Nov 2018

    Received by Plymouth

  2. 16 Nov 2018

    Validated

    Checked as complete and ready for consideration.

  3. 10 Jan 2019

    Decision issued: Grant Conditionally

  4. 1 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

217 applications on PlanIndex · across 23 councils · 97% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Residential Blocks Frankfort Gate (West End Gables)

    18/01917/FUL Submitted 8 Nov 2018 8m away

    Removal of existing concrete panels and windows and installation of new cladding panels and windows.

    Granted Full applications Windows or glazing 14 docs
  • Car Park, Colin Campbell Court Plymouth PL1 1PZ

    26/00836/CDM Submitted 12 Jun 2026 22m away

    93% historically approved · decision due ~7 Aug

    Planning Condition Discharge: Conditions 14 (Car Parking Management Strategy) and 16 (Signage Strategy) of application 26/00443/S73

    Awaiting decision 4 docs
  • 12 Frankfort Gate Plymouth PL1 1QD

    23/00154/MOR Submitted 6 Feb 2023 29m away

    Pre-application to create internal opening between Nos. 10 and 12

    Decided Outline 5 docs
  • Outside 1 Frankfort Gate Plymouth

    23/00157/ADV Submitted 6 Feb 2023 43m away

    Proposed Free-Standing Advertising Information Unit featuring 2x internally illuminated digital displays (H 1635mm x W 924mm) to replace existing Free-Standing Advertising Information Unit featuring 2x internally illuminated 6-sheet displays.

    Granted Advertising 17 docs
  • 25 Market Avenue Plymouth PL1 1PG

    19/01878/FUL Submitted 25 Nov 2019 57m away

    Removal of existing timber framed single glazed shop front and replacement with uPVC double glazed windows and disabled access door and access ramp.

    Granted Full applications Windows or glazing 11 docs
  • Market Avenue Plymouth PL1 1PE

    25/01003/MOR Submitted 28 Jul 2025 64m away

    Proposed demolition of Units 1 to11 at Market Avenue, Plymouth.

    Decided Outline Demolition 10 docs

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications