Planning application
91 - 93 North Prospect Road Plymouth PL2 2NA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use from offices (Class A2) to support training centre (Class D1).
As published by the council, reference 18/01609/FUL
Application record
- Reference
- 18/01609/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 17 Sep 2018
- Validated
- 18 Sep 2018
- Decided
- 23 Oct 2018
- Ward
- HAM
- Decision by
- Delegated Decision
- Postcode
- PL2 2NA
Timeline
Dates from the published record
-
17 Sep 2018
Received by Plymouth
-
18 Sep 2018
Validated
Checked as complete and ready for consideration.
-
23 Oct 2018
Decision issued: Grant Conditionally
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Plymouth
73 applications on PlanIndex · across 10 councils · 89% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
59 Beacon Park Road Plymouth PL2 2PG
Hardstanding (retrospective) and dropped kerb
Granted Full applications 16 docs -
-
Beacon Park Road Plymouth PL2 2PH
Proposed 5G telecoms installation: H3G 16m street pole and additional equipment cabinets
Granted Outline 20 docs -
Scott Business Park Beacon Park Road Plymouth PL2 2PQ
92% historically approved · decision due ~25 Sep
T018 - fell. T013 - fell. G017 - Pollard all 4 trees at 4 metres in height.
Awaiting decision Trees 4 docs -
1 - 3 Allenby Road Plymouth PL2 3JH
Demolition of 2 houses and garages. Development of 9 affordable dwellings.
Granted Full applications Demolition 66 docsSeveral homes -
13 Greatlands Place Plymouth PL2 3JF
A single-storey rear extension which extends beyond the rear wall of the original dwellinghouse by 4.0m, has a maximum height of 3.5m to ridge and has an eaves height of 3.2m
Refused Householder Extension 6 docsSmall domestic
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works
-
26/01197/FUL Awaiting decision
51 Emma Place Plymouth PL1 3QU
Installation of EV charger to facilitate pavement channel charging