Skip to content
PlanIndex Get alerts
Menu

Planning application

17 Wombwell Crescent Plymouth PL2 2DW

Granted Plymouth 18/01497/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension

As published by the council, reference 18/01497/FUL

Application record

Reference
18/01497/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
29 Aug 2018
Validated
30 Aug 2018
Decided
1 Nov 2018
Ward
DEVONPORT
Decision by
Delegated Decision
Postcode
PL2 2DW

Timeline

Dates from the published record

  1. 29 Aug 2018

    Received by Plymouth

  2. 30 Aug 2018

    Validated

    Checked as complete and ready for consideration.

  3. 1 Nov 2018

    Decision issued: Grant Conditionally

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Building S023, Hms Drake Saltash Road Keyham Plymouth PL2 2DQ

    26/01156/FUL Submitted 13 Aug 2026 121m away

    93% historically approved · decision due ~23 Oct

    Replacement of defective steel lintels with associated masonry repairs and installation of a replacement timber door.

    Awaiting decision Full applications 18 docs
  • Building S023, Hms Drake Saltash Road Keyham Plymouth PL2 2DQ

    26/01157/LBC Submitted 13 Aug 2026 121m away

    100% historically approved · decision due ~23 Oct

    Replacement of defective steel lintels with associated masonry repairs and installation of a replacement timber door.

    Awaiting decision Heritage and listed buildings
  • HMNB Devonport Plymouth Devon

    25/01501/MOR Submitted 14 Nov 2025 142m away

    Pre-application for the installation of a two-storey modular building to accommodate a replacement dental facility (or relocated offices) for a temporary period of up to 10 years with associated surface-mounted drainage; external staircase and ramp.

    Decided Outline 12 docs
  • 12 Ocean Street Plymouth PL2 2DJ

    25/01150/PRDE Submitted 1 Sep 2025 195m away

    Change of use from residential "C3" 3-bed dwelling to residential "C4" 6-bed HMO internal alteration and refurbishment including conversion of roof space to create HMO accommodation comprising 6 bedrooms with en-suite shower facilities

    Decided Outline 12 docs
    Domestic
  • 27 Renown Street Plymouth PL2 2DF

    26/00546/FUL Submitted 16 Apr 2026 206m away

    EV charging point

    Granted Full applications 11 docs
  • HMS Drake, Saltash Road Keyham Plymouth PL2 2DQ

    24/01273/AMD Submitted 2 Oct 2024 252m away

    Re-location of vents at 5th floor level from window panels to wall panels.

    Decided Amendments Windows or glazing 3 docs

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications