Planning application

Land At Looseleigh Lane Plymouth

Granted Plymouth 18/01466/FUL Full Application

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

New dwelling with associated works (resubmission of 17/00724/FUL)

As published by the council, reference 18/01466/FUL

Application record

Reference
18/01466/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Grant Conditionally
Received
21 Aug 2018
Validated
21 Aug 2018
Decided
16 Nov 2018
Ward
BUDSHEAD
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 21 Aug 2018

    Received by Plymouth

  2. 16 Nov 2018

    Decision issued: Grant Conditionally

  3. 16 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Plymouth granted permission on 16 November 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Plot 7, Esthwaite Lane Land At Looseleigh Lane Plymouth

    19/00803/S73 Submitted 17 May 2019 50 yards away

    Variation of Condition 1 (Approved Plans) of application 18/01466/FUL: Minor material amendment including repositioning of dwelling and repositioning of windows.

    Granted Amendments Windows or glazing 12 docs
    Domestic
  • Land On The Entrance Of Esthwaite Lane

    19/01724/TPO Submitted 30 Oct 2019 50 yards away

    T1: The removal of one low hanging branch over the garden to give a clearance above ground level of 2.4m. T2: Reduction of lower lateral branches by 1-2m on the north side of the Yew tree overhanging boundary of number 1 Esthwaite Lane. T3: This tree is to be retained as it is an important part of the group and not removed. Removal of deadwood (this is exempt work). Amendments agreed with owner 27/1/2020.

    Granted Trees 9 docs
  • 3 Esthwaite Lane Plymouth PL6 5FQ

    26/00273/TPO Submitted 24 Feb 2026 50 yards away

    Reduce Beech tree

    Granted Trees 5 docs
  • 129 Looseleigh Lane Plymouth PL6 5HW

    18/01124/CDM Submitted 25 Jun 2018 50 yards away

    Condition Discharge: Conditions 3, 5 & 6 of application 18/00290/FUL

    Granted Conditions 15 docs
  • 7 Esthwaite Lane Plymouth PL6 5FQ

    24/01376/TPO Submitted 18 Oct 2024 100 yards away

    G1 - Group of 6 Lime trees - Pollard to previous pruning points at approx 13m

    Granted Trees 5 docs
  • 131 Looseleigh Lane Plymouth PL6 5HW

    18/01939/TPO Submitted 13 Nov 2018 100 yards away

    2 x Leylandii - fell.

    Granted Trees 3 docs

In Plymouth

  • 26/01330/FUL Granted

    54 Glendower Road Plymouth PL3 4LD

    Installation of EV charger to facilitate pavement channel charging

    Received 23 Sep, published by the council 25 Sep 2026 Full applications
  • 26/00965/FUL Granted

    11 Radnor Place Plymouth PL4 8DW

    Conversion of house into two flats (2no C3)

    Received 8 Jul, published by the council 15 Sep 2026 Full applications
  • 26/00720/FUL Granted

    Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Roof and wall replacement to Building S154 (part retrospective)

    Received 21 May, published by the council 10 Sep 2026 Full applications
  • 26/00865/FUL Granted

    1 Siding Road Plymouth PL4 6AF

    Removal and replacement of timber cladding with cement render across front elevation and gable ends of building

    Received 16 Jun, published by the council 26 Jul 2026 Full applications
  • 26/01511/FUL Awaiting decision

    15 Pomphlett Road Plymouth PL9 7BH

    Proposed secondary means of escape from roof

    Received 30 Oct, published by the council 4 Nov 2026 Full applications