Planning application

18/00901/FUL

Vauxhall Quay Sutton Harbour Plymouth PL4 0DT

Granted Plymouth Full Application

Proposal

Erection of new decked structure within harbour basin, with two single storey A1 / A3 commercial units and one A1 / A3 pavilion unit, with alterations to listed quay side area to accommodate services access and pedestrian link, with upgrade to electricity substation and new pontoon access to harbour ferry and associated works

As published by the council, reference 18/00901/FUL

Timeline

Dates from the published record

  1. 21 May 2018

    Received by Plymouth

  2. 25 May 2018

    Validated

    Checked as complete and ready for consideration.

  3. 26 Mar 2019

    Decision issued: Grant conditionally subject to S106

  4. 31 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 18/00902/LBC Granted

    Vauxhall Quay Sutton Harbour Plymouth PL4 0DT

    Erection of new decked structure within harbour basin, with two single storey A1 / A3 commercial units and one A1 / A3 pavilion unit, with alterations to listed quay side area to accommodate services access and pedestrian link, with upgrade to electricity sub station, new pontoon access to harbour ferry and associated works

    21 May 2018 0m away Heritage and listed buildings
  • 26/00752/TCO Granted

    Vauxhall Court, Stillman Street Plymouth PL4 0DS

    T1, T2+ T3- Crown reduce to previous pollard points.

    28 May 2026 103m away Trees
  • 26/00154/FUL Granted

    12 Quay Road Plymouth PL1 2JZ

    External seating area with associated works (part retrospective)

    30 Jan 2026 114m away Full applications
  • 18/00822/ADV Granted

    The Customs House Parade Plymouth PL1 2JL

    Hanging sign to be displayed to the front elevation of the property

    9 May 2018 116m away Advertising
  • 24/00881/MOR Decided

    33 Southside Street Plymouth PL1 2LE

    Pre-application for conversion of existing office to new 1-bed duplex apartment and roof extension to create new 2-bed apartment

    10 Jul 2024 129m away Outline
  • 23/00105/TCO Granted

    7 Stillman Court Stillman Street Plymouth PL4 0DU

    Prunus Avium (T1) - Fell to ground level. Malus Sylvestris (T2) - Fell to ground level and replace with suitable species (fastigiate/upright species).

    25 Jan 2023 141m away Trees

In Plymouth

  • 26/00322/FUL Refused

    21 Law Walk Plymouth PL6 6LY

    Domestic loft conversion with dormers

    4 Mar 2026 Full applications
  • 26/00786/FUL Granted

    73 Eggbuckland Road Plymouth PL3 5JR

    First floor garage extension to create games room

    4 Jun 2026 Full applications
  • 26/00529/FUL Granted

    58 Montacute Avenue Plymouth PL5 3PR

    Single storey front extension and hardstanding (part-retrospective)

    13 Apr 2026 Full applications
  • 26/00519/FUL Granted

    54 Elm Road Plymouth PL4 7BB

    Installation of EV charger to facilitate pavement channel charging

    10 Apr 2026 Full applications
  • 26/00758/FUL Granted

    45 Kingsley Road Plymouth PL4 6QP

    Installation of EV charger to facilitate pavement channel charging

    1 Jun 2026 Full applications