Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Osborne Place Lockyer Street Plymouth PL1 2PU

Granted Plymouth 18/00858/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Internal alterations

As published by the council, reference 18/00858/LBC

Application record

Reference
18/00858/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Grant Conditionally
Received
14 May 2018
Validated
14 May 2018
Decided
13 Jul 2018
Ward
ST PETER AND THE WATERFRONT
Decision by
Delegated Decision
Postcode
PL1 2PU

Site history

Applications at this address on the Plymouth register

This site has had 2 applications since 2018: 2 approved, 0 refused.

  • 26/01013/LBC Granted

    3 Osborne Place Lockyer Street Plymouth PL1 2PU

    Investigation and repair of water ingress affecting the front entrance, including lifting and reinstatement of paving, installation of waterproofing measures, repair works to the structure below and replacement of the entrance step finish with mosaic tiling.

    Decided 11 Sep 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 14 May 2018

    Received by Plymouth

  2. 13 Jul 2018

    Decision issued: Grant Conditionally

  3. 31 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Stackhouse Design Ltd Agent, a design practice registered in Plymouth

Active · incorporated 2020 · Plymouth

37 applications on PlanIndex · across 3 councils · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Plymouth granted permission on 13 July 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Plymouth

  • 26/01057/LBC Decided

    1 Bowden Farm Church Hill Plymouth PL6 5RB

    12 PV panels and associated battery

    Received 27 Jul, published by the council 31 Jul 2026 Heritage and listed buildings
  • 26/01277/LBC Awaiting decision

    6 Penlee Gardens Plymouth PL3 4AN

    4no. wooden double glazed sash windows replacing existing uPVC.

    Received 14 Sep, published by the council 15 Sep 2026 Heritage and listed buildings
  • 26/01013/LBC Granted

    3 Osborne Place Lockyer Street Plymouth PL1 2PU

    Investigation and repair of water ingress affecting the front entrance, including lifting and reinstatement of paving, installation of waterproofing measures, repair works to the structure below and replacement of the entrance step finish with mosaic tiling.

    Received 17 Jul, published by the council 31 Jul 2026 Heritage and listed buildings
  • 26/01014/LBC Granted

    53 Emma Place Plymouth PL1 3QU

    Additional low profile rear skylight

    Received 17 Jul, published by the council 26 Jul 2026 Heritage and listed buildings
  • 26/00875/LBC Decided

    53 Emma Place Plymouth PL1 3QU

    Replacement rear access bridge and door

    Received 18 Jun, published by the council 26 Jul 2026 Heritage and listed buildings