Proposal

Proposed change of use/redevelopment of the existing Bubbles Hand Car Wash site to provide an electric vehicle (EV) charging hub comprising the installation of 10 accessible EV charging bays, ancillary Infrastructure and associated infrastructure works including resurfacing of the existing hardstanding and perimeter landscaping.

As published by the council, reference 26/002538/FUL

Timeline

Dates from the published record

  1. 30 Jun 2026

    Received by Peterborough

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Peterborough for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 11/01718/NDMTEL Granted

    Land Opposite The Bowling Green Maskew Avenue New England Peterborough

    Installation of additional dish antenna to existing monopole

    27 Oct 2011 40m away Telecoms
  • 12/01522/FUL Refused

    K2 Recruitment 805 Lincoln Road Peterborough PE1 3HG

    Proposed portakabin for use as additional office space and new 1.8m high fence

    5 Oct 2012 127m away Full applications
  • 12/00384/FUL Granted

    789 Lincoln Road Peterborough PE1 3HE

    Change of use of ground floor from shop and flat to shop only and separation of flat from shop including installation of external steel staircase

    20 Mar 2012 146m away Full applications
  • 24/01256/DISCHG Decided

    The Boulevard Retail Park Maskew Avenue New England Peterborough

    Discharge of condition C17 (noise) of planning permission 23/00779/FUL

    26 Sep 2024 156m away Conditions
  • 12/00212/FUL Granted

    787 Lincoln Road Peterborough PE1 3HE

    Change of use of storage building to 24 hour taxi call office

    14 Feb 2012 159m away Full applications
  • 12/01172/FUL Granted

    740 Lincoln Road Peterborough PE1 3HQ

    Change of use from motor retail and workshop to A1 retail

    14 Aug 2012 159m away Full applications

In Peterborough

  • 26/002449/FUL Granted

    Grange Farm, Old Oundle Road, Thornhaugh, Peterborough, PE8 6NR

    Change of use of agricultural land to dog walking paddock

    4 Jun 2026 Full applications
  • 26/002404/FUL Granted

    Grange Farm Old Oundle Road Thornhaugh Peterborough PE8 6NR

    Change of use of agricultural storage area for the siting of 15 self-storage containers

    21 May 2026 Full applications
  • 26/002485/WCPP Granted

    5, Grafton Avenue, Peterborough, PE3 9PD

    25/01595/HHFUL - Variation of condition C3 (materials)

    11 May 2026 Full applications
  • 26/002328/FUL Granted

    Ailsworth Methodist Church, Main Street, Ailsworth, Peterborough, PE5 7AF

    Change of use from chapel (F1) to community shop (F2) and partial demolition of existing flat roof extension

    30 Apr 2026 Full applications
  • 26/002663/FUL Awaiting decision

    The White Hart, Main Street, Ufford, Peterborough, PE9 3BH

    Engineering and landscaping works to the front curtilage including the replacement and levelling of hard surfacing to form an altered patio area, installation of boundary planters and creation of a pedestrian opening and masonry steps through the existing curtilage retaining wall - retrospective

    27 Jul 2026 Full applications