Planning application
25/01515/FUL
18 Church Street Stanground Peterborough PE2 8HE
Proposal
Splitting the existing dwelling into two residential dwellings and internal alterations, the conversion and extension of an existing barn to a residential dwelling, demolition of an existing row of garages and the erection of a new build bungalow. Addition of rooflights to the rear elevation, application of render to the modern extension
As published by the council, reference 25/01515/FUL
Timeline
Dates from the published record
-
22 Nov 2025
Received by Peterborough
-
16 Dec 2025
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Peterborough for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/01539/LBC Awaiting decision
18 Church Street Stanground Peterborough PE2 8HE
Splitting the existing dwelling into two residential dwellings, part demolition of rear projection, insertion of rooflights and internal and external alterations and repairs
-
12/00089/DISCHG Decided
16 Church Street Stanground Peterborough PE2 8HE
Replacement of existing front door to composite door and 2 windows to the front
-
11/01241/FUL Granted
16 Church Street Stanground Peterborough PE2 8HE
Replacement of existing front door to composite door and 2 windows to the front
-
12/00805/FUL Granted
Stanground Baptist Church Chapel Street Stanground Peterborough PE2 8JG
Erection of single storey shed
-
11/01548/ADV Refused
9-11 Church Street Stanground Peterborough PE2 8HE
Two non-illuminated signs (retrospective)
-
11/01962/FUL Granted
Trade Car Centre 11 Church Street Stanground Peterborough PE2 8HE
Change of use of vacant land to car storage, increase in displayed sales cars to 25, retention of boundary fencing - retrospective
Other full applications applications
In Peterborough
-
26/002449/FUL Granted
Grange Farm, Old Oundle Road, Thornhaugh, Peterborough, PE8 6NR
Change of use of agricultural land to dog walking paddock
-
26/002404/FUL Granted
Grange Farm Old Oundle Road Thornhaugh Peterborough PE8 6NR
Change of use of agricultural storage area for the siting of 15 self-storage containers
-
26/002485/WCPP Granted
5, Grafton Avenue, Peterborough, PE3 9PD
25/01595/HHFUL - Variation of condition C3 (materials)
-
26/002328/FUL Granted
Ailsworth Methodist Church, Main Street, Ailsworth, Peterborough, PE5 7AF
Change of use from chapel (F1) to community shop (F2) and partial demolition of existing flat roof extension
-
26/002663/FUL Awaiting decision
The White Hart, Main Street, Ufford, Peterborough, PE9 3BH
Engineering and landscaping works to the front curtilage including the replacement and levelling of hard surfacing to form an altered patio area, installation of boundary planters and creation of a pedestrian opening and masonry steps through the existing curtilage retaining wall - retrospective