Planning application
1 Milton Road Fletton Peterborough PE2 8DZ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of from offices (Use Class E) to 3no. bedroom residential dwelling
As published by the council, reference 25/00869/FUL
Application record
- Reference
- 25/00869/FUL
- Type
- Planning Application (Full)
- Decision
- Permitted
- Received
- 14 Jul 2025
- Decided
- 2 Sep 2025
- Postcode
- PE2 8DZ
Site history
Applications at this address on the Peterborough register
This site has had 2 applications since 2024: 1 approved, 1 refused.
-
24/01294/FUL Refused
1 Milton Road Fletton Peterborough PE2 8DZ
Change of use from office (Use Class E) to residential dwelling (Use Class C3).
Timeline
Dates from the published record
-
14 Jul 2025
Received by Peterborough
-
2 Sep 2025
Decision issued: Permitted
-
8 Aug 2026
Added to PlanIndex
What this grant of permission means
Peterborough granted permission on 2 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
8 Duke Street Fletton Peterborough PE2 8EB
Single storey rear extension Maximum length from original rear wall: 6m Maximum
Decided Prior approval ExtensionSmall domestic -
1 Milton Road Fletton Peterborough PE2 8DZ
Change of use from office (Use Class E) to residential dwelling (Use Class C3).
Refused Full applications 11 docsDomestic -
153, 155, 157, 159, 161, 163, 165, 167, 169, 171 Fellowes Road Fletton Peterborough PE2 8EA
Discharge conditions C5 and C6 on Blocks C and D of planning permision 03/00353/FUL- Residential development comprising of 4 blocks (94 apartments in total) with car parking and associated works
Decided Conditions New dwelling 5 docsMajor scheme -
114 - 116 High Street Fletton Peterborough PE2 8DP
Change of use from existing Bank (Class E) to community church and place of wors
Refused Full applications -
Store At Rear Of 130 High Street Fletton Peterborough PE2 8DP
Demolition of store and construction of a 2 storey building for 2 x 2 bed residential flats
Withdrawn Full applications New dwelling Demolition 16 docs -
3 Duke Street Fletton Peterborough PE2 8EB
Timber construction car port - Retrospective
Granted Householder 9 docsDomestic
Other full applications
In Peterborough
-
25/01181/FUL Granted
Christ The Servant King Church Silver Hill Hampton Centre Peterborough PE7 8FF
Change of use of land to a private car park serving Christ the Servant King Chur
-
26/002197/FUL Granted
Garage site adjacent to 45, Bluebell Avenue, Peterborough, PE1 3XQ
Demolition of existing garages and replace with permeable block paving parking spaces, enclosed with new fencing to boundaries with neighbouring homes
-
26/002397/FUL Granted
Ducati Peterborough Peterborough Road Wansford Peterborough PE8 6JN
Change of use from workshop (B2) to mixed use B2 and Sui Generis (car showroom)
-
26/002836/FUL Status unknown
15 South Parade Peterborough PE3 6BG
13-unit residential development consisting of 9 flats, 4 maisonettes, and associ
-
26/002499/FUL Refused
Moor Farm House, Moor Road, Milking Nook, Peterborough, PE6 7PQ
Workshop building associated with existing vehicle repair workshop (retrospectiv