22/01692/FUL
Lloyds TSB Computer Centre Stirling Way Bretton Peterborough PE3 8YD
Proposal
Installation of a cooling plant comprising of 3 x chillers, 3 x plant rooms and 3 x water cooling tanks
As published by the council, reference 22/01692/FUL
Timeline
Dates from the published record
-
5 Dec 2022
Received by Peterborough
-
14 Dec 2022
Validated
Checked as complete and ready for consideration.
-
8 Mar 2023
Decision issued: Permitted
-
23 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
11/01120/NONMAT Decided
Lloyds TSB Computer Centre Stirling Way Bretton Peterborough PE3 8YD
Non-material amendment to planning permission 11/00576/FUL- Erection of a new prefabricated security lodge, including new access ramps, security palisade fencing and gate, and low level air conditioning plant- Amendment to side door west elevation from 1 ½ doors to 2 equal size automatic side doors
-
11/01162/NONMAT Decided
Lloyds TSB Computer Centre Stirling Way Bretton Peterborough PE3 8YD
Non-material amendment to planning application 11/00362/FUL - Replacement of existing internal generators with new external containerised generator with new louvred and cladding screen; installation of new control panel in courtyard at first floor level
-
12/01233/FUL Granted
Lloyds TSB Computer Centre Stirling Way Bretton Peterborough PE3 8YD
Installation of water mist building for fire suppression of existing plant equipment
-
12/01230/FUL Granted
Lloyds TSB Computer Centre Stirling Way Bretton Peterborough PE3 8YD
Install 2.4m high galvanised palisade fencing with access gates, north and south site boundary's along with reshaping of earth mounds
-
23/00021/DISCHG Decided
Land To The North Of Lloyds TSB Stirling Way Bretton Peterborough
Discharge of conditions C7 (Construction Management Plan), C12 (Construction Ecological Management Plan), C13 (Ecology Design Strategy), C18 (Remediation Strategy and Verification Plan), C19 (Remedial Closure Report) of planning permission reference 22/00531/FUL
-
12/01100/FUL Refused
Peterborough Dairies 3 John Wesley Road Werrington Peterborough PE4 6ZP
Temporary residential accommodation for occupation by managers of Peterborough Dairies
Other full applications applications
In Peterborough
-
26/002449/FUL Granted
Grange Farm, Old Oundle Road, Thornhaugh, Peterborough, PE8 6NR
Change of use of agricultural land to dog walking paddock
-
26/002404/FUL Granted
Grange Farm Old Oundle Road Thornhaugh Peterborough PE8 6NR
Change of use of agricultural storage area for the siting of 15 self-storage containers
-
26/002485/WCPP Granted
5, Grafton Avenue, Peterborough, PE3 9PD
25/01595/HHFUL - Variation of condition C3 (materials)
-
26/002328/FUL Granted
Ailsworth Methodist Church, Main Street, Ailsworth, Peterborough, PE5 7AF
Change of use from chapel (F1) to community shop (F2) and partial demolition of existing flat roof extension
-
26/002663/FUL Awaiting decision
The White Hart, Main Street, Ufford, Peterborough, PE9 3BH
Engineering and landscaping works to the front curtilage including the replacement and levelling of hard surfacing to form an altered patio area, installation of boundary planters and creation of a pedestrian opening and masonry steps through the existing curtilage retaining wall - retrospective