Planning application
Former Stage 2 Building Saville Road Industrial Estate Saville Road Westwood Peterborough PE3 7PR
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of condition 6 (New pedestrian footway and crossing point) of Planning Permission 14/00310/FUL Installation of mezzanine floor within existing class A1 retail unit and alterations to car park layout
As published by the council, reference 14/02031/WCPP
Application record
- Reference
- 14/02031/WCPP
- Type
- Without Compliance (Planning Permission)
- Status
- Decided
- Decision
- Permitted
- Received
- 17 Nov 2014
- Validated
- 17 Nov 2014
- Decided
- 10 Dec 2015
- Ward
- Ravensthorpe
- Parish
- Peterborough
- Decision by
- Delegated Decision (Officer)
- Postcode
- PE3 7PR
Site history
Applications at this address on the Peterborough register
This site has had 3 applications since 2014: 1 approved, 0 refused.
-
14/01857/ADV Split decision
Former Stage 2 Building Saville Road Industrial Estate Saville Road Westwood Peterborough PE3 7PR
10 internally illuminated fascia signs attached to the main building, 7 non-illuminated fascia signs attached to the main building, 2 freestanding internally illuminated totem signs, 1 freestanding non-illuminated deliveries sign (Retrospective)
-
14/01856/DISCHG Decided
Former Stage 2 Building Saville Road Industrial Estate Saville Road Westwood Peterborough PE3 7PR
Discharge of conditions C2 (Construction Management Plan), C3 (Cycle Parking) and C5 (Travel Statement) of Planning Permission 14/00310/FUL - Installation of mezzanine floor within existing class A1 retail unit and alterations to car park layout
Timeline
Dates from the published record
-
17 Nov 2014
Received by Peterborough
-
10 Dec 2015
Decision issued: Permitted
-
25 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
651 applications on PlanIndex · across 99 councils · 93% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Peterborough granted permission on 10 December 2015, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Former Stage 2 Building Saville Road Industrial Estate Saville Road Westwood Peterborough PE3 7PR
10 internally illuminated fascia signs attached to the main building, 7 non-illuminated fascia signs attached to the main building, 2 freestanding internally illuminated totem signs, 1 freestanding non-illuminated deliveries sign (Retrospective)
Split decision Advertising 11 docs -
Former Stage 2 Building Saville Road Industrial Estate Saville Road Westwood Peterborough PE3 7PR
Discharge of conditions C2 (Construction Management Plan), C3 (Cycle Parking) and C5 (Travel Statement) of Planning Permission 14/00310/FUL - Installation of mezzanine floor within existing class A1 retail unit and alterations to car park layout
Decided Conditions 9 docs -
Enterprise 26 Westwood 7 Industrial Estate Saville Road Westwood Peterborough PE3 7PR
Use of industrial unit as a 24 hour taxi call office and garage
Granted Full applications 7 docs -
BT Telecommunication Centre Saville Road Westwood Peterborough PE3 7PR
Installation of new palisade fencing and double gates to both south and east elevations of building 1 and west facing elevation of building 2. Re-location of 2 training poles from the South East corner of the site to the North West corner. Installation of 4 new CCTV cameras
Granted Full applications 7 docs -
Units 7 And 8 Saville Road Industrial Estate Saville Road Westwood Peterborough PE3 7PR
Conversion of existing retail party shop (Class E) to proposed gym (Class E)
Decided Lawful development -
Vacant Land Westwood Farm Industrial Estate Bretton Gate Peterborough PE3 9UP
Discharge of condition C9 (external lighting) of planning permission 23/01734/FUL
Decided Conditions 6 docs
Other full applications
In Peterborough
-
25/01181/FUL Granted
Christ The Servant King Church Silver Hill Hampton Centre Peterborough PE7 8FF
Change of use of land to a private car park serving Christ the Servant King Chur
-
26/002197/FUL Granted
Garage site adjacent to 45, Bluebell Avenue, Peterborough, PE1 3XQ
Demolition of existing garages and replace with permeable block paving parking spaces, enclosed with new fencing to boundaries with neighbouring homes
-
26/002397/FUL Granted
Ducati Peterborough Peterborough Road Wansford Peterborough PE8 6JN
Change of use from workshop (B2) to mixed use B2 and Sui Generis (car showroom)
-
26/002836/FUL Status unknown
15 South Parade Peterborough PE3 6BG
13-unit residential development consisting of 9 flats, 4 maisonettes, and associ
-
26/002499/FUL Refused
Moor Farm House, Moor Road, Milking Nook, Peterborough, PE6 7PQ
Workshop building associated with existing vehicle repair workshop (retrospectiv