Planning application
Hereward Community College Reeves Way Eastfield Peterborough PE1 5LQ
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Relates to 12/00717/R3FUL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of condition C30 (flood risk assessment) of planning permission 12/00717/R3FUL, - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom A new single storey SEN school for 90 pupils will also be constructed on the site
As published by the council, reference 12/01839/WCPP
Application record
- Reference
- 12/01839/WCPP
- Type
- Without Compliance (Planning Permission)
- Status
- Decided
- Decision
- Granted As published: Permitted
- Received
- 4 Dec 2012
- Validated
- 4 Dec 2012
- Decided
- 5 Mar 2013
- Ward
- East
- Parish
- Peterborough
- Decision by
- Delegated Decision (Officer)
- Postcode
- PE1 5LQ
Site history
Applications at this address on the Peterborough register
This site has had 5 applications since 2012: 1 approved, 0 refused.
-
12/01838/DISCHG Decided
Hereward Community College Reeves Way Eastfield Peterborough PE1 5LQ
Discharge of conditions C21 (boundary fencing and ext. lighting), C22 (hard and soft landscaping), C23 (bat and bird boxes), C24 (Lighting details), C25 (cycle parking), C26 (surface water drainage), C16 (lighting levels) of planning permission 12/00717/R3FUL dated 13/07/12 - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom A new single storey SEN school for 90 pupils will also be constructed on the site
-
12/01562/DISCHG Decided
Hereward Community College Reeves Way Eastfield Peterborough PE1 5LQ
Discharge of condition C28 (Ecology Management Plan) of planning permission 12/00717/R3FUL dated 13/07/2012 - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy
-
12/01208/DISCHG Decided
Hereward Community College Reeves Way Eastfield Peterborough PE1 5LQ
Discharge of conditions C6 (remediation) and C24 (drainage) of planning permission 12/00717/R3FUL dated 13/07/2012 - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom - a new single storey SEN school for 90 pupils will also be constructed on the site
-
12/00850/DISCHG Decided
Hereward Community College Reeves Way Eastfield Peterborough PE1 5LQ
Discharge of conditions C2 (materials), C9 (wildlife), C11 (CMP) and C23 (archaeology) of planning permission 12/00717/R3FUL dated 13/07/2012 - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom - a new single storey SEN school for 90 pupils will also be constructed on the site
Timeline
Dates from the published record
-
4 Dec 2012
Received by Peterborough
-
5 Mar 2013
Decision issued: Permitted
-
23 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
12/00717/R3FUL Granted
City Of Peterborough Academy Former Hereward Community College Reeves Way Eastfield Peterborough PE1 5LQ
Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom A new single storey SEN school for 90 pupils will also be constructed on the site
3 later applications on the register refer to this one:
-
14/00344/DISCHG Decided
City Of Peterborough Academy Reeves Way Eastfield Peterborough PE1 5LQ
Discharge of condition C7 (Bus stop works), C10 (Offsite highway works), C12 (Revised school travel plan), C30 (Archaeological works) of planning permission 12/01839/WCPP - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom
-
13/01137/DISCHG Decided
City Of Peterborough Academy Reeves Way Eastfield Peterborough PE1 5LQ
Discharge of Condition 14 (Community User Agreement) of 12/01839/WCPP - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom A new single storey SEN school for 90 pupils will also be constructed on the site
-
13/00827/DISCHG Decided
City Of Peterborough Academy Reeves Way Eastfield Peterborough PE1 5LQ
Discharge condition 17 (odour control) and 18 (control of noise from site) of planning permission 12/01839/WCPP - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom A new single storey SEN school for 90 pupils will also be constructed on the site
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Peterborough granted permission on 5 March 2013, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Hereward Community College Reeves Way Eastfield Peterborough PE1 5LQ
Discharge of conditions C2 (materials), C9 (wildlife), C11 (CMP) and C23 (archaeology) of planning permission 12/00717/R3FUL dated 13/07/2012 - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom - a new single storey SEN school for 90 pupils will also be constructed on the site
Decided Conditions Extension Demolition 15 docsSmall domestic -
City Of Peterborough Academy Former Hereward Community College Reeves Way Eastfield Peterborough PE1 5LQ
Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom A new single storey SEN school for 90 pupils will also be constructed on the site
Granted Full applications Extension Demolition 85 docsSmall domestic -
City Of Peterborough Academy Reeves Way Eastfield Peterborough PE1 5LQ
Discharge of Condition 14 (Community User Agreement) of 12/01839/WCPP - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom A new single storey SEN school for 90 pupils will also be constructed on the site
Decided Conditions Extension Demolition 4 docsSmall domestic -
Hereward Community College Reeves Way Eastfield Peterborough PE1 5LQ
Discharge of conditions C21 (boundary fencing and ext. lighting), C22 (hard and soft landscaping), C23 (bat and bird boxes), C24 (Lighting details), C25 (cycle parking), C26 (surface water drainage), C16 (lighting levels) of planning permission 12/00717/R3FUL dated 13/07/12 - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom A new single storey SEN school for 90 pupils will also be constructed on the site
Decided Conditions Extension Demolition 70 docsSmall domestic -
Hereward Community College Reeves Way Eastfield Peterborough PE1 5LQ
Discharge of condition C28 (Ecology Management Plan) of planning permission 12/00717/R3FUL dated 13/07/2012 - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy
Decided Conditions 4 docs -
Hereward Community College Reeves Way Eastfield Peterborough PE1 5LQ
Discharge of conditions C6 (remediation) and C24 (drainage) of planning permission 12/00717/R3FUL dated 13/07/2012 - Refurbishment and development of the former Hereward school buildings and site to create the new City of Peterborough Academy, work consists of refurbishment of the existing buildings including construction of a new two storey link block, two additional classrooms and a small extension to the changing rooms, demolition of existing plantroom - a new single storey SEN school for 90 pupils will also be constructed on the site
Decided Conditions Extension Demolition 14 docsSmall domestic
Other full applications
In Peterborough
-
26/002920/FUL Awaiting decision
400, Eastfield Road, Peterborough, PE1 4RE
Proposed new dwelling and associated access
-
26/002562/FUL Granted
16 Commerce Road Lynch Wood Peterborough PE2 6LR
External alterations comprising the recladding of the main entrance, the erectio
-
26/002898/FUL Status unknown
2 Peterborough Road Eye Peterborough PE6 7YB
Replacement of existing enclosed pergola with a single storey extension
-
26/002901/FUL Status unknown
Amazon EUK1 Flaxley Road, Peterborough, PE2 9EN
Minor external alterations and associated works to the existing B8 warehouse an
-
26/002003/FUL Refused
BUFFINGHAM MINIATURE SCHNAUZERS, Buffingham Kennels, Waterworks Lane, Glinton, Peterborough, PE6 7LP
Proposed continuation of use of land and siting of mobile home in connection with and use of land, kennels and associated fencing and parking as licensed establishment for breeding dogs