Skip to content
PlanIndex Get alerts
Menu

Planning application

12/01610/FUL

Warehouse Site Corner Of Morley Way/Maxwell Road Woodston Peterborough PE2 7JB

Granted Peterborough Planning Application (Full)

Proposal

Construction of standby generator compound

As published by the council, reference 12/01610/FUL

Timeline

Dates from the published record

  1. 31 Oct 2012

    Received by Peterborough

  2. 20 Dec 2012

    Decision issued: Permitted

  3. 23 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 11/01255/FUL Granted

    Warehouse Site Corner Of Morley Way/Maxwell Road Woodston Peterborough PE2 7BW

    Change of use to proposed standby generator compound on existing car park area, comprising 18 X generator sets, 8 X diesel fuel tanks, switchgear housing to existing industrial building, 1.8m high palisade security fencing, pair of access gates and single pedestrian gate

    5 Aug 2011 16m away Full applications
  • 11/00065/FUL Granted

    United Vanliners 2 Godric Square Woodston Peterborough PE2 7JH

    Change of use to personal training gymnasium - retrospective

    23 Jun 2011 44m away Full applications
  • 12/00240/FUL Granted

    Eurodix Ltd Morley Way Woodston Peterborough PE2 7BW

    Change of use from B8 (Warehouse) to B2 (Assembly and Manufacture)

    17 Feb 2012 108m away Full applications
  • 11/01136/FUL Granted

    Lawrence David Maxwell Road Woodston Peterborough PE2 7JR

    Creation of a new mezzanine floor to provide additional office space inside existing building, insertion of new windows into existing front elevation at mezzanine level, and replacement of old canopy

    22 Jul 2011 226m away Full applications
  • 12/01438/NONMAT Decided

    Lloyds TSB Bank Plc Danelaw House 2 Woodston Gate Woodston Peterborough PE2 7LF

    Non-material amendment to planning permission 04/01463/FUL dated 27/10/2004 (Extension and re-cladding of warehouse to form a new storage facility and service yard with erection of fence and wall, and relocated security gates) - to remove the existing cylindrical diesel fuel tank on north side of premises and replace with new rectangular tank on existing concrete support plinths

    31 Oct 2012 233m away Amendments
  • 12/01407/FUL Granted

    Lloyds TSB Bank Plc Danelaw House 2 Woodston Gate Woodston Peterborough PE2 7LF

    Installation of new lighting 2m high on existing north and south gantries located between existing P3A, B and C Depot buildings

    26 Sep 2012 233m away Full applications

In Peterborough

  • 26/002449/FUL Granted

    Grange Farm, Old Oundle Road, Thornhaugh, Peterborough, PE8 6NR

    Change of use of agricultural land to dog walking paddock

    4 Jun 2026 Full applications
  • 26/002404/FUL Granted

    Grange Farm Old Oundle Road Thornhaugh Peterborough PE8 6NR

    Change of use of agricultural storage area for the siting of 15 self-storage containers

    21 May 2026 Full applications
  • 26/002485/WCPP Granted

    5, Grafton Avenue, Peterborough, PE3 9PD

    25/01595/HHFUL - Variation of condition C3 (materials)

    11 May 2026 Full applications
  • 26/002328/FUL Granted

    Ailsworth Methodist Church, Main Street, Ailsworth, Peterborough, PE5 7AF

    Change of use from chapel (F1) to community shop (F2) and partial demolition of existing flat roof extension

    30 Apr 2026 Full applications
  • 26/002663/FUL Awaiting decision

    The White Hart, Main Street, Ufford, Peterborough, PE9 3BH

    Engineering and landscaping works to the front curtilage including the replacement and levelling of hard surfacing to form an altered patio area, installation of boundary planters and creation of a pedestrian opening and masonry steps through the existing curtilage retaining wall - retrospective

    27 Jul 2026 Full applications