Use of Ground floor premises as A1 hairdressing salon - Retrospective

As published by the council, reference 12/00273/FUL

Timeline

Dates from the published record

  1. 27 Feb 2012

    Received by Peterborough

  2. 19 Apr 2012

    Decision issued: Permitted

  3. 28 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/002335/ADV Withdrawn

    Pavement outside 102-104 Lower Bridge Street, Peterborough

    Installation of an internally illuminated freestanding double-sided digital advertisement unit, advertised space measuring 932mm x 1653mm

    6 May 2026 25m away Advertising
  • 11/01701/ADV Granted

    92 Bridge Street Peterborough PE1 1DY

    Non-illuminated fascia with brushed copper lettering and one externally Illuminated projecting sign with brushed copper lettering

    27 Oct 2011 26m away Advertising
  • 12/00605/ADV Granted

    Sue Ryder Care 97 - 99 Bridge Street Peterborough PE1 1EH

    Replacement of two front and side advertisement fascia signs

    20 Apr 2012 39m away Advertising
  • 12/01710/CTR Granted

    Tree Between The Rivergate And The Magistrates Court Bridge Street Peterborough

    Tree works as submitted survey

    5 Nov 2012 49m away Trees
  • 12/00259/WCPP Withdrawn

    130 Bridge Street Peterborough

    Removal of condition C16 of planning permission 96/00001/FUL - Erection of 24 flats over A3 use class on ground floor level (as amended by revised plans received by the Local Planning Authority on 29.9.97)

    5 Mar 2012 62m away Full applications
  • 12/00364/WCPP Withdrawn

    130 Bridge Street Peterborough

    Variation of condition C10 of planning permission 04/00216/FUL - Alterations to previously approved scheme 96/P0735, 96/00001/FUL to allow five flats on ground floor in place of A3 use - Amended scheme

    7 Mar 2012 65m away Full applications

In Peterborough

  • 26/002449/FUL Granted

    Grange Farm, Old Oundle Road, Thornhaugh, Peterborough, PE8 6NR

    Change of use of agricultural land to dog walking paddock

    4 Jun 2026 Full applications
  • 26/002404/FUL Granted

    Grange Farm Old Oundle Road Thornhaugh Peterborough PE8 6NR

    Change of use of agricultural storage area for the siting of 15 self-storage containers

    21 May 2026 Full applications
  • 26/002485/WCPP Granted

    5, Grafton Avenue, Peterborough, PE3 9PD

    25/01595/HHFUL - Variation of condition C3 (materials)

    11 May 2026 Full applications
  • 26/002328/FUL Granted

    Ailsworth Methodist Church, Main Street, Ailsworth, Peterborough, PE5 7AF

    Change of use from chapel (F1) to community shop (F2) and partial demolition of existing flat roof extension

    30 Apr 2026 Full applications
  • 26/002663/FUL Awaiting decision

    The White Hart, Main Street, Ufford, Peterborough, PE9 3BH

    Engineering and landscaping works to the front curtilage including the replacement and levelling of hard surfacing to form an altered patio area, installation of boundary planters and creation of a pedestrian opening and masonry steps through the existing curtilage retaining wall - retrospective

    27 Jul 2026 Full applications