Skip to content
PlanIndex Get alerts
Menu

Planning application

Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

Granted Peterborough 10/01267/FUL Planning Application (Full)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of 295 residential units, A1 Food Store, and associated infrastructure

As published by the council, reference 10/01267/FUL

Application record

Reference
10/01267/FUL
Type
Planning Application (Full)
Status
Decided
Decision
Granted As published: Permitted
Received
14 Sep 2010
Validated
14 Sep 2010
Decided
24 Mar 2011
Ward
Fletton & Woodston
Parish
Peterborough
Decision by
Committee Decision
Postcode
PE2 8EE

Site history

Applications at this address on the Peterborough register

This site has had 7 applications since 2010: 1 approved, 0 refused.

  • 13/01356/NONMAT Decided

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Non-material amendment to planning permission 10/01267/FUL - Construction of 295 residential units, A1 Food Store, and associated infrastructure

    Decided 8 Oct 2013 Amendments
  • 13/01091/DISCHG Decided

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Discharge of conditions C1 to C34 (inclusive) of planning permission 10/01267/FUL Construction of 295 residential units, A1 Food Store, and associated infrastructure

    Decided 23 Oct 2013 Conditions
  • 12/00960/DISCHG Decided

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Discharge of conditions C5 (boundary treatment), C18 trafffic calming), C28 (landscaping) C32 ( wall detail) of previous planning permission 10/01267/FUL - Construction of 295 residential units, A1 Food Store, and associated infrastructure

    Decided 13 Mar 2013 Conditions
  • 12/00433/NONMAT Decided

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Non-material amendment to planning application 10/01267/FUL dated 23/03/2011 (Construction of 295 residential units, A1 Food Store, and associated infrastructure) - changes to apartment building including revisions to layout & elevations

    Decided 27 Jul 2012 Amendments
  • 12/00215/DISCHG Decided

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Discharge of Conditions C2 (Materials), C4 (Construction Management Plan), C7 (Drainage), C9 (Levels), C11, C12 and C13 (Remediation), C17, (Noise), C22 and C23 (Site layout), C24 (Site layout), C25 (Road etc), C30 (Arboricultural Method Statment) and C31 (Vibration Report) of planning permission 10/01267/FUL - Construction of 295 residential units, A1 Food Store, and associated infrastructure

    Decided 13 Mar 2013 Conditions
  • 11/01192/NONMAT Decided

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Non-material amendment of planning permission ref. 10/01267/FUL (Construction of 295 residential units, A1 Food Store, and associated infrastructure) for minor changes to house type elevations

    Decided 31 Oct 2011 Amendments

Timeline

Dates from the published record

  1. 14 Sep 2010

    Received by Peterborough

  2. 24 Mar 2011

    Decision issued: Permitted

  3. 16 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

11 later applications on the register refer to this one:

  • 14/00488/NONMAT Awaiting decision

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough

    Non-material amendment to planning permission 10/01267/FUL - Construction of 295 residential units, A1 Food Store, and associated infrastructure

    Submitted 24 Mar 2014 Amendments
  • 14/00089/FUL Granted

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough

    Plot substitutions to approved layout of planning permission 10/01267/FUL and provision of 7 additional dwellings

    Decided 3 Jul 2014 Full applications
  • 13/01356/NONMAT Decided

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Non-material amendment to planning permission 10/01267/FUL - Construction of 295 residential units, A1 Food Store, and associated infrastructure

    Decided 8 Oct 2013 Amendments
  • 13/01315/NONMAT Decided

    Glebe Works Glebe Court Fletton Peterborough

    Non-material amendment to planning permission 10/01267/FUL dated 23.03.2011 (Construction of 295 residential units, A1 Food Store, and associated infrastructure) for plot amendments and revisions to housetype plan forms and development of character area elevations

    Decided 1 Oct 2013 Amendments
  • 13/01091/DISCHG Decided

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Discharge of conditions C1 to C34 (inclusive) of planning permission 10/01267/FUL Construction of 295 residential units, A1 Food Store, and associated infrastructure

    Decided 23 Oct 2013 Conditions
  • 12/01526/WCPP Granted

    Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Variation of condition C15 of planning permission 10/01267/FUL dated 23/03/2011 - to deliver the residential dwellings to a standard that complies with the code for sustainable homes (2010) level 6 in all except the Issue ID ENE1 (Category 1: Energy and carbon dioxide emissions)

    Decided 28 Nov 2013 Full applications
  • 12/00960/DISCHG Decided

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Discharge of conditions C5 (boundary treatment), C18 trafffic calming), C28 (landscaping) C32 ( wall detail) of previous planning permission 10/01267/FUL - Construction of 295 residential units, A1 Food Store, and associated infrastructure

    Decided 13 Mar 2013 Conditions
  • 12/00433/NONMAT Decided

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Non-material amendment to planning application 10/01267/FUL dated 23/03/2011 (Construction of 295 residential units, A1 Food Store, and associated infrastructure) - changes to apartment building including revisions to layout & elevations

    Decided 27 Jul 2012 Amendments
  • 12/00215/DISCHG Decided

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Discharge of Conditions C2 (Materials), C4 (Construction Management Plan), C7 (Drainage), C9 (Levels), C11, C12 and C13 (Remediation), C17, (Noise), C22 and C23 (Site layout), C24 (Site layout), C25 (Road etc), C30 (Arboricultural Method Statment) and C31 (Vibration Report) of planning permission 10/01267/FUL - Construction of 295 residential units, A1 Food Store, and associated infrastructure

    Decided 13 Mar 2013 Conditions
  • 11/01228/DISCHG Decided

    Carbon Challenge Glebe Court Fletton Peterborough PE2 8EE

    Discharge of conditions 4, 7, 8, 9, 11, 17, 19, 20, 22, 23, 24, 25, 27, 30, 31, 33, 34 and 35 of planning permission 10/01267/FUL - Construction of 295 residential units, A1 food store and associated infrastructure

    Decided 23 Nov 2011 Conditions
  • 11/01192/NONMAT Decided

    Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    Non-material amendment of planning permission ref. 10/01267/FUL (Construction of 295 residential units, A1 Food Store, and associated infrastructure) for minor changes to house type elevations

    Decided 31 Oct 2011 Amendments

Documents

Plans, drawings, consultee responses and the officer's report

169 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Peterborough granted permission on 24 March 2011, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    11/01192/NONMAT Submitted 29 Jul 2011 50 yards away

    Non-material amendment of planning permission ref. 10/01267/FUL (Construction of 295 residential units, A1 Food Store, and associated infrastructure) for minor changes to house type elevations

    Decided Amendments 26 docs
  • Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough

    14/00089/FUL Submitted 21 Feb 2014 50 yards away

    Plot substitutions to approved layout of planning permission 10/01267/FUL and provision of 7 additional dwellings

    Granted Full applications 38 docs
  • Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    12/00215/DISCHG Submitted 29 Feb 2012 50 yards away

    Discharge of Conditions C2 (Materials), C4 (Construction Management Plan), C7 (Drainage), C9 (Levels), C11, C12 and C13 (Remediation), C17, (Noise), C22 and C23 (Site layout), C24 (Site layout), C25 (Road etc), C30 (Arboricultural Method Statment) and C31 (Vibration Report) of planning permission 10/01267/FUL - Construction of 295 residential units, A1 Food Store, and associated infrastructure

    Decided Conditions 39 docs
  • Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough PE2 8EE

    12/00433/NONMAT Submitted 19 Mar 2012 50 yards away

    Non-material amendment to planning application 10/01267/FUL dated 23/03/2011 (Construction of 295 residential units, A1 Food Store, and associated infrastructure) - changes to apartment building including revisions to layout & elevations

    Decided Amendments 63 docs
  • Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough

    14/00488/NONMAT Submitted 24 Mar 2014 50 yards away

    88% historically approved · decision due ~19 May

    Non-material amendment to planning permission 10/01267/FUL - Construction of 295 residential units, A1 Food Store, and associated infrastructure

    Awaiting decision Amendments 58 docs
  • Carbon Challenge Site Glebe Works Glebe Court Fletton Peterborough

    14/00134/DISCHG Submitted 27 Jan 2014 50 yards away

    88% historically approved · decision due ~24 Mar

    Discharge of conditions 2 (Materials), 3 (Temporary Facilities). 4 (Construction Management Plan), 5 (Enclosures), 6 (Street Lighting), 7 (Foul and Surface Water Drainage), 9 (Levels and Cross Sections), 11 (Remediation Scheme), 14 (Satellite Dish), 15 (Zero Carbon Compliance), 18 (Traffic Calming), 19 (Revised Road Widths), 20 (Revised Road Details), 22 (Vehicle and Pedestrian Visibility Splays), 23 (Vehicle and Pedestrian Visibility Splays), 24 (Road Widths), 25 (Public Highway Construction) 26(Footpath), 27 (Parking Layout), 28 (Landscaping), 29 (Landscaping), 33 (Drainage), (34 (Surface Water Drainage), 35 (Drainage)

    Awaiting decision Conditions 175 docs

In Peterborough

  • 26/002951/FUL Status unknown

    Land East of Staplee Way, Parnwell, Peterborough, PE1 4YT

    Erection of 4no. B2/B8 Buildings with Associated Works

    5 Oct 2026 Full applications
  • 26/002968/FUL Status unknown

    331 Lincoln Road Peterborough PE1 2PF

    Proposed Change of Use from Class E to Sui Generis Adult Gaming Centre (AGC), sh

    Received 2 Oct, published by the council 5 Oct 2026 Full applications
  • 26/002999/FUL Status unknown

    Limes Farm, Main Street, Barnack, Stamford, PE9 3DN

    Demolition of predominantly modern farm buildings to enable partial site redevel

    Received 1 Oct, published by the council 5 Oct 2026 Full applications
  • 26/002739/FUL Refused

    88 Sycamore Avenue Dogsthorpe Peterborough PE1 4JU

    Change of use from C3 to C2 (children's Home)

    Received 10 Aug, published by the council 15 Aug 2026 Full applications
  • 26/002960/FUL Awaiting decision

    Land Adjacent to 75, High Street, Maxey, Peterborough, PE6 9EE

    Erection of a one and a half storey detached dwelling with integral garage

    29 Sep 2026 Full applications