Land Off Storeys Bar Road Storeys Bar Road Fengate Peterborough

Withdrawn Peterborough 10/00876/WCPP Without Compliance (Planning Permission)

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Variation of Condition 10 of planning permission 08/01081/ELE to allow the construction of temporary access road

As published by the council, reference 10/00876/WCPP

Application record

Reference
10/00876/WCPP
Type
Without Compliance (Planning Permission)
Status
Decided
Decision
Withdrawn As published: Withdrawn by Applicant
Received
30 Jun 2010
Validated
30 Jun 2010
Decided
18 Jan 2011
Ward
East
Parish
Peterborough
Decision by
Delegated Decision (Officer)

Site history

Applications at this address on the Peterborough register

This site has had 7 applications since 2008.

  • 14/02058/NONMAT Decided

    Land Off Storeys Bar Road Storeys Bar Road Fengate Peterborough

    Non-material amendment to planning permission 08/01081/ELE Construction and operation of an energy from waste and biomass fuelled generating station - Create dual access. Widen bridge over padholm drain. Replace roundabout with priority junction. Realignment of storey bar road between the two dual access points. Road layout with site adjustments to coordinate with amended access arrangements, location of gatehouse and entrance to car park area of research and development centre

    Decided 23 Dec 2015 Amendments
  • 14/00077/DISCHG Decided

    Land Off Storeys Bar Road Storeys Bar Road Fengate Peterborough

    Discharge of conditions attached to Permission 08/01081/ELE (Energy Park) as follows; C31 and C32 (site drainage)

    Decided 4 Apr 2014 Conditions
  • 13/01913/DISCHG Decided

    Land Off Storeys Bar Road Storeys Bar Road Fengate Peterborough

    Discharge of conditions attached to Permission 08/01081/ELE (Energy Park) as follows; C5 (Layout and design), C19 (Traffic management plan and access route), C37, C38 & C39 (Archaeology) and C46, C47 & C48 (Landscape and creative conservation)

    Decided 21 Feb 2014 Conditions
  • 11/00067/NONMAT Decided

    Land Off Storeys Bar Road Storeys Bar Road Fengate Peterborough

    Variation of condition C10 of planning permission 08/01081/ELE - Energy Park comprising two fully enclosed materials recycling, conversion and manufacturing buildings (comprising materials receipt and recycling hall, recycled material store and biomass storage, food waste bio-reactor/digester, biomass energy conversion area with 9 stacks; dry cooling system; plasma enhanced vitrification area and remanufacturing processes), research and development centre with visitor space, WEEE re-use building, administration building, vehicle store/workshop, weighbridge, landscaping and habitat creation (including lakes, reed beds , brown and green roofs , tree belt and meadow border) and the realignment of Storeys Bar Road between the junction with Edgerley Drain Road and Vicarage Farm Road and the site access, pelican crossing, shared footpath /cycleway on Storeys Bar Road and extension to the Green Wheel cycle network.SUBMISSION OF APPENDIX D RESPONSE

    Decided 2 Feb 2011 Amendments
  • 10/00360/DISCHG Decided

    Land Off Storeys Bar Road Storeys Bar Road Fengate Peterborough

    Discharge of conditions 4, 5, 10, 11, 13, 19, 30 and 40 of planning application 08/01081/ELE - Energy Park comprising two fully enclosed materials recycling, conversion and manufacturing buildings (comprising materials receipt and recycling hall, recycled material store and biomass storage, food waste bio-reactor/digester, biomass energy conversion area with 9 stacks; dry cooling system; plasma enhanced vitrification area and remanufacturing processes), research and development centre with visitor space, WEEE re-use building, administration building, vehicle store/workshop, weighbridge, landscaping and habitat creation (including lakes, reed beds , brown and green roofs , tree belt and meadow border) and the realignment of Storeys Bar Road between the junction with Edgerley Drain Road and Vicarage Farm Road and the site access, pelican crossing, shared footpath /cycleway on Storeys Bar Road and extension to the Green Wheel cycle network.

    Decided 2 Feb 2011 Conditions
  • 08/01081/ELE Decided

    Land Off Storeys Bar Road Storeys Bar Road Fengate Peterborough

    Energy Park comprising two fully enclosed materials recycling, conversion and manufacturing buildings (comprising materials receipt and recycling hall, recycled material store and biomass storage, food waste bio-reactor/digester, biomass energy conversion area with 9 stacks; dry cooling system; plasma enhanced vitrification area and remanufacturing processes), research and development centre with visitor space, WEEE re-use building, administration building, vehicle store/workshop, weighbridge, landscaping and habitat creation (including lakes, reed beds , brown and green roofs , tree belt and meadow border) and the realignment of Storeys Bar Road between the junction with Edgerley Drain Road and Vicarage Farm Road and the site access, pelican crossing, shared footpath /cycleway on Storeys Bar Road and extension to the Green Wheel cycle network.SUBMISSION OF APPENDIX D RESPONSE

    Decided 4 Nov 2009 Other

Timeline

Dates from the published record

  1. 30 Jun 2010

    Received by Peterborough

  2. 18 Jan 2011

    Decision issued: Withdrawn by Applicant

  3. 26 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What withdrawal means

The applicant withdrew this application before Peterborough decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land Off Storeys Bar Road Storeys Bar Road Fengate Peterborough

    11/00067/NONMAT Submitted 10 Jan 2011 50 yards away

    Variation of condition C10 of planning permission 08/01081/ELE - Energy Park comprising two fully enclosed materials recycling, conversion and manufacturing buildings (comprising materials receipt and recycling hall, recycled material store and biomass storage, food waste bio-reactor/digester, biomass energy conversion area with 9 stacks; dry cooling system; plasma enhanced vitrification area and remanufacturing processes), research and development centre with visitor space, WEEE re-use building, administration building, vehicle store/workshop, weighbridge, landscaping and habitat creation (including lakes, reed beds , brown and green roofs , tree belt and meadow border) and the realignment of Storeys Bar Road between the junction with Edgerley Drain Road and Vicarage Farm Road and the site access, pelican crossing, shared footpath /cycleway on Storeys Bar Road and extension to the Green Wheel cycle network.SUBMISSION OF APPENDIX D RESPONSE

    Decided Amendments Extension Trees 6 docs
  • Land Off Storeys Bar Road Storeys Bar Road Fengate Peterborough

    14/02058/NONMAT Submitted 26 Nov 2014 50 yards away

    Non-material amendment to planning permission 08/01081/ELE Construction and operation of an energy from waste and biomass fuelled generating station - Create dual access. Widen bridge over padholm drain. Replace roundabout with priority junction. Realignment of storey bar road between the two dual access points. Road layout with site adjustments to coordinate with amended access arrangements, location of gatehouse and entrance to car park area of research and development centre

    Decided Amendments 25 docs
  • Land Off Storeys Bar Road Storeys Bar Road Fengate Peterborough

    08/01081/ELE Submitted 24 Sep 2008 50 yards away

    Energy Park comprising two fully enclosed materials recycling, conversion and manufacturing buildings (comprising materials receipt and recycling hall, recycled material store and biomass storage, food waste bio-reactor/digester, biomass energy conversion area with 9 stacks; dry cooling system; plasma enhanced vitrification area and remanufacturing processes), research and development centre with visitor space, WEEE re-use building, administration building, vehicle store/workshop, weighbridge, landscaping and habitat creation (including lakes, reed beds , brown and green roofs , tree belt and meadow border) and the realignment of Storeys Bar Road between the junction with Edgerley Drain Road and Vicarage Farm Road and the site access, pelican crossing, shared footpath /cycleway on Storeys Bar Road and extension to the Green Wheel cycle network.SUBMISSION OF APPENDIX D RESPONSE

    Decided Other Extension Trees 42 docs
  • Land Off Storeys Bar Road Storeys Bar Road Fengate Peterborough

    13/01913/DISCHG Submitted 23 Dec 2013 50 yards away

    Discharge of conditions attached to Permission 08/01081/ELE (Energy Park) as follows; C5 (Layout and design), C19 (Traffic management plan and access route), C37, C38 & C39 (Archaeology) and C46, C47 & C48 (Landscape and creative conservation)

    Decided Conditions 31 docs
  • Land Off Storeys Bar Road Storeys Bar Road Fengate Peterborough

    14/00077/DISCHG Submitted 17 Jan 2014 50 yards away

    Discharge of conditions attached to Permission 08/01081/ELE (Energy Park) as follows; C31 and C32 (site drainage)

    Decided Conditions 19 docs
  • Peterborough Power Station Storeys Bar Road Fengate Peterborough PE1 5NT

    14/02227/PRIOR Submitted 24 Dec 2014 350 yards away

    Demolition works - 1) Reduce the two boiler structures including the main stacks to ground level2) Remove the steam turbine, auxiliary equipment and water treatment plant from within the turbine hall3) Remove the air cooled condenser structure to ground level4) Fuel Oil Tank Farm - Remove the bund wall, forwarding pumphouse, tanks and above ground pipework

    Granted Prior approval Demolition 13 docs

In Peterborough

  • 26/002951/FUL Status unknown

    Land East of Staplee Way, Parnwell, Peterborough, PE1 4YT

    Erection of 4no. B2/B8 Buildings with Associated Works

    5 Oct 2026 Full applications
  • 26/002968/FUL Status unknown

    331 Lincoln Road Peterborough PE1 2PF

    Proposed Change of Use from Class E to Sui Generis Adult Gaming Centre (AGC), sh

    Received 2 Oct, published by the council 5 Oct 2026 Full applications
  • 26/002999/FUL Status unknown

    Limes Farm, Main Street, Barnack, Stamford, PE9 3DN

    Demolition of predominantly modern farm buildings to enable partial site redevel

    Received 1 Oct, published by the council 5 Oct 2026 Full applications
  • 26/002739/FUL Refused

    88 Sycamore Avenue Dogsthorpe Peterborough PE1 4JU

    Change of use from C3 to C2 (children's Home)

    Received 10 Aug, published by the council 15 Aug 2026 Full applications
  • 26/002960/FUL Awaiting decision

    Land Adjacent to 75, High Street, Maxey, Peterborough, PE6 9EE

    Erection of a one and a half storey detached dwelling with integral garage

    29 Sep 2026 Full applications