Planning application
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Works: Extension Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
As published by the council, reference 10/00719/FUL
Application record
- Reference
- 10/00719/FUL
- Type
- Planning Application (Full)
- Status
- Decided
- Decision
- Permitted
- Received
- 28 May 2010
- Validated
- 28 May 2010
- Decided
- 30 Jul 2010
- Ward
- Orton Waterville
- Parish
- Orton Waterville
- Decision by
- Committee Decision
- Postcode
- PE2 5RQ
Site history
Applications at this address on the Peterborough register
This site has had 9 applications since 2010: 2 approved, 0 refused.
-
12/00220/DISCHG Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of condition C7 ( Landscape scheme), C10 (Service yard area) and C27 (Community use scheme) of planning permission 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
-
11/01854/DISCHG Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of condition C8 ( Final travel plan), C9 ( Kitchen ventilation), C10 (Service yard details) of planning permission 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
-
11/00631/DISCHG Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of external lighting element of condition C3 (CCTV, walls/fences and external lighting) of planning permission 10/00719/FUL dated 30.07.10 (Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building)
-
11/00130/DISCHG Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of CCTV element of condition 3 (CCTV, walls/fences and external lighting) of Planning Permission 10/00719/FUL (Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building)
-
10/01443/NONMAT Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Non material amendment to planning permission 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
-
10/01424/DISCHG Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of condition C6, C29, C30, C31 of planning permission 10/00719/FUL dated 30.07.10 - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
-
10/01176/FUL Granted
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Provision of a new maintenance depot within the grounds of the Ormiston Bushfield Academy and relocation of the 4 x existing containers from an adjacent site
-
10/01121/NONMAT Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Non-material amendment to application 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
Timeline
Dates from the published record
-
28 May 2010
Received by Peterborough
-
30 Jul 2010
Decision issued: Permitted
-
26 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
11 later applications on the register refer to this one:
-
12/00458/DISCHG Decided
Ormiston Bushfield Academy Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of conditions C32 (bat and bird boxes) and C34 (roosting or hibernating bats) of planning permission 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
-
12/00220/DISCHG Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of condition C7 ( Landscape scheme), C10 (Service yard area) and C27 (Community use scheme) of planning permission 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
-
11/01854/DISCHG Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of condition C8 ( Final travel plan), C9 ( Kitchen ventilation), C10 (Service yard details) of planning permission 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
-
11/00631/DISCHG Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of external lighting element of condition C3 (CCTV, walls/fences and external lighting) of planning permission 10/00719/FUL dated 30.07.10 (Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building)
-
11/00130/DISCHG Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of CCTV element of condition 3 (CCTV, walls/fences and external lighting) of Planning Permission 10/00719/FUL (Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building)
-
10/01443/NONMAT Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Non material amendment to planning permission 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
-
10/01424/DISCHG Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of condition C6, C29, C30, C31 of planning permission 10/00719/FUL dated 30.07.10 - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
-
10/01299/DISCHG Decided
Ormiston Bushfield Academy Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of condition C2, C3, C4, C7, C13, C22, C26 of planning permission 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
-
10/01261/DISCHG Decided
Ormiston Bushfield Academy Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of condition C25 (playing fields) of planning permission 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
-
10/01140/DISCHG Decided
Orminston Bushfield Academy Ortongate Peterborough PE2 5RQ
Discharge of condition C33 (amphibian fence) of planning permission 10/00719/FUL
-
10/01121/NONMAT Decided
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Non-material amendment to application 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
Documents
Plans, drawings, consultee responses and the officer's report
97 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Peterborough granted permission on 30 July 2010, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Ormiston Bushfield Academy Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of conditions C32 (bat and bird boxes) and C34 (roosting or hibernating bats) of planning permission 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
Decided Conditions Extension Demolition 8 docs -
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of condition C8 ( Final travel plan), C9 ( Kitchen ventilation), C10 (Service yard details) of planning permission 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
Decided Conditions Extension Demolition 9 docs -
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of condition C7 ( Landscape scheme), C10 (Service yard area) and C27 (Community use scheme) of planning permission 10/00719/FUL - Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building
Decided Conditions Extension Demolition 11 docs -
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of CCTV element of condition 3 (CCTV, walls/fences and external lighting) of Planning Permission 10/00719/FUL (Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building)
Decided Conditions Extension Demolition 3 docs -
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Discharge of external lighting element of condition C3 (CCTV, walls/fences and external lighting) of planning permission 10/00719/FUL dated 30.07.10 (Construction of a new two storey high academy school building, incorporating the library, young people's centre and early years centre, and demolition of the existing academy, library and Sheridan Centre buildings. Provision of associated external areas, including sports fields, a floodlit all weather pitch, car parking and public plaza, with associated access, alterations to cycle way and boundary treatments. Extension to the existing Bushfield Sports Centre, the re-cladding of its front elevation and the construction of a new colonnade feature. The refurbishment and extension of the existing changing pavilion building)
Decided Conditions Extension Demolition 5 docs -
Bushfield Community College Bushfield Orton Goldhay Peterborough PE2 5RQ
Provision of a new maintenance depot within the grounds of the Ormiston Bushfield Academy and relocation of the 4 x existing containers from an adjacent site
Granted Full applications 16 docs
Other full applications
In Peterborough
-
25/01181/FUL Granted
Christ The Servant King Church Silver Hill Hampton Centre Peterborough PE7 8FF
Change of use of land to a private car park serving Christ the Servant King Chur
-
26/002197/FUL Granted
Garage site adjacent to 45, Bluebell Avenue, Peterborough, PE1 3XQ
Demolition of existing garages and replace with permeable block paving parking spaces, enclosed with new fencing to boundaries with neighbouring homes
-
26/002397/FUL Granted
Ducati Peterborough Peterborough Road Wansford Peterborough PE8 6JN
Change of use from workshop (B2) to mixed use B2 and Sui Generis (car showroom)
-
26/002836/FUL Status unknown
15 South Parade Peterborough PE3 6BG
13-unit residential development consisting of 9 flats, 4 maisonettes, and associ
-
26/002499/FUL Refused
Moor Farm House, Moor Road, Milking Nook, Peterborough, PE6 7PQ
Workshop building associated with existing vehicle repair workshop (retrospectiv