Planning application
St Augustines Church Of England Primary School Palmerston Road Woodston Peterborough PE2 9DH
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of a new hall and extension to classroom, covered play area, extension of playground and the creation of a multi-use games area
As published by the council, reference 10/00564/FUL
Application record
- Reference
- 10/00564/FUL
- Type
- Planning Application (Full)
- Status
- Decided
- Decision
- Permitted
- Received
- 24 May 2010
- Validated
- 24 May 2010
- Decided
- 19 Jul 2010
- Ward
- Fletton & Woodston
- Parish
- Fletton
- Decision by
- Delegated Decision (Officer)
- Postcode
- PE2 9DH
Timeline
Dates from the published record
-
24 May 2010
Received by Peterborough
-
19 Jul 2010
Decision issued: Permitted
-
26 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
St Augustines Church Of England Primary School Palmerston Road Woodston Peterborough PE2 9DH
Installation of an additional section of the perimeter security fence to the North West
Granted Full applications 4 docsSmall domestic -
Garages Brewster Avenue Woodston Peterborough
Erection of 3 x two-bedroom dwellings with on-site parking
Refused Full applications 27 docs -
De Montfort Court Palmerston Road Woodston Peterborough
Discharge of conditions C4 (Lighting, hardsurfacing, boundary treatment) and C10 (Access) of Planning Permission 13/00935/FUL - Demolition of existing building known as No.1-25 De Montfort Court, including associated external works and parking, and construction of 6 x 2-bed and 6 x 3 bed affordable dwellings, including associated works and parking
Decided Conditions Demolition 19 docs -
37 Palmerston Road Woodston Peterborough PE2 9DQ
Proposed demolition of existing outbuildings and replacement with new residential unit comprising 2 x two-bedroom flats
Refused Full applications New dwelling Demolition 15 docs -
Brewster Avenue Infant School Brewster Avenue Woodston Peterborough PE2 9PN
Installation of security fencing and tarmac play surface
Granted Full applications 8 docs -
15-75 Earl Spencer Court Peterborough PE2 9PQ
Replacement of all windows with new like-for-like white double glazed PVCu casement windows and 23.no entrance doors to be replaced with white composite door
Granted Full applications Windows or glazing 17 docs
Other full applications applications
In Peterborough
-
25/01181/FUL Granted
Christ The Servant King Church Silver Hill Hampton Centre Peterborough PE7 8FF
Change of use of land to a private car park serving Christ the Servant King Chur
-
26/002197/FUL Granted
Garage site adjacent to 45, Bluebell Avenue, Peterborough, PE1 3XQ
Demolition of existing garages and replace with permeable block paving parking spaces, enclosed with new fencing to boundaries with neighbouring homes
-
26/002397/FUL Granted
Ducati Peterborough Peterborough Road Wansford Peterborough PE8 6JN
Change of use from workshop (B2) to mixed use B2 and Sui Generis (car showroom)
-
26/002836/FUL Status unknown
15 South Parade Peterborough PE3 6BG
13-unit residential development - consisting of 9 flats, 4 maisonettes, and ass
-
26/002499/FUL Refused
Moor Farm House, Moor Road, Milking Nook, Peterborough, PE6 7PQ
Workshop building associated with existing vehicle repair workshop (retrospectiv