Planning application
E H Smith 8 Botolph Bridge Industrial Estate Oundle Road Woodston Peterborough PE2 9QP
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use from builders merchant (B8) to education, training and office use (D1 and or B1 Use)
As published by the council, reference 10/00077/FUL
Application record
- Reference
- 10/00077/FUL
- Type
- Planning Application (Full)
- Status
- Decided
- Decision
- Permitted
- Received
- 26 Jan 2010
- Validated
- 26 Jan 2010
- Decided
- 22 Mar 2010
- Ward
- Fletton & Woodston
- Parish
- Peterborough
- Decision by
- Delegated Decision (Officer)
- Postcode
- PE2 9QP
Timeline
Dates from the published record
-
26 Jan 2010
Received by Peterborough
-
22 Mar 2010
Decision issued: Permitted
-
26 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
CK Direct Peterborough Ltd 9 Botolph Bridge Industrial Estate Oundle Road Woodston Peterborough PE2 9QP
Proposed side extension to existing lean-to store
Granted Full applications Extension 6 docs -
9 Botolph Bridge Industrial Estate Oundle Road Woodston Peterborough PE2 9QP
Change of use from builders merchant (B8) to B2 (industrial) and/or B1 (office), B8 (storage) use
Granted Full applications 7 docs -
Land Adjacent 13 Botolph Bridge Industrial Estate Oundle Road Woodston Peterborough PE2 9QP
New industrial unit
Granted Full applications 12 docs -
Land Adjacent To 13 Botolph Bridge Industrial Estate Oundle Road Woodston Peterborough PE2 9QP
Erection of 1 x industrial unit with facility for workshop and MOT bay
Granted Full applications 14 docs -
4 Botolph Bridge Industrial Estate Oundle Road Woodston Peterborough PE2 9QP
Erection of acoustic fencing
Granted Full applications 8 docs -
18 Lansdowne Walk Woodston Peterborough PE2 7GD
Single storey rear extension
Granted Full applications Extension 7 docsSmall domestic
Other full applications applications
In Peterborough
-
25/01181/FUL Granted
Christ The Servant King Church Silver Hill Hampton Centre Peterborough PE7 8FF
Change of use of land to a private car park serving Christ the Servant King Chur
-
26/002197/FUL Granted
Garage site adjacent to 45, Bluebell Avenue, Peterborough, PE1 3XQ
Demolition of existing garages and replace with permeable block paving parking spaces, enclosed with new fencing to boundaries with neighbouring homes
-
26/002397/FUL Granted
Ducati Peterborough Peterborough Road Wansford Peterborough PE8 6JN
Change of use from workshop (B2) to mixed use B2 and Sui Generis (car showroom)
-
26/002836/FUL Status unknown
15 South Parade Peterborough PE3 6BG
13-unit residential development - consisting of 9 flats, 4 maisonettes, and ass
-
26/002499/FUL Refused
Moor Farm House, Moor Road, Milking Nook, Peterborough, PE6 7PQ
Workshop building associated with existing vehicle repair workshop (retrospectiv