Planning application
Land To The Rear Of Stuart House Chapel Street Peterborough
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of a cycle shelter (capacity 20 cycles)
As published by the council, reference 09/01508/FUL
Application record
- Reference
- 09/01508/FUL
- Type
- Planning Application (Full)
- Status
- Decided
- Decision
- Permitted
- Received
- 8 Jan 2010
- Validated
- 8 Jan 2010
- Decided
- 24 Feb 2010
- Ward
- Central
- Parish
- Peterborough
- Decision by
- Delegated Decision (Officer)
Timeline
Dates from the published record
-
8 Jan 2010
Received by Peterborough
-
24 Feb 2010
Decision issued: Permitted
-
26 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Stuart House St Johns Street Eastgate Peterborough
East and west entrance cladding, facade and entrance alterations and refurbishment, car parking reconfiguration, additional provision and external landscaping works
Granted Full applications 23 docs -
Land At New Road And Chapel Street Peterborough
Condition 6 of Planning Permission 05/00819/FUL
Decided Conditions 2 docs -
-
32, TRAVEL LODGE PETERBOROUGH CENTRAL, New Road, Peterborough, PE1 1FW
London Plane (1803) Crown lift over highway as per tree survey (06/00001/TPO)
Granted Trees 7 docs -
Travel Lodge Peterborough Central 32 New Road Peterborough PE1 1TT
T1 London Plane of TPO 2006_01- Remove major deadwood- Crown raise approximately 3 metres over footpaths- Crown raise approximately 5.2 metres over roads- Clear building of all branch ends by approximately 2 metres
Granted Trees 4 docs -
Uk Border Agency Zone 5 Third Floor Stuart House City Road Peterborough PE1 1QF
Installation of new and replacement of existing air conditioning plant
Granted Full applications 6 docs
Other full applications applications
In Peterborough
-
25/01181/FUL Granted
Christ The Servant King Church Silver Hill Hampton Centre Peterborough PE7 8FF
Change of use of land to a private car park serving Christ the Servant King Chur
-
26/002197/FUL Granted
Garage site adjacent to 45, Bluebell Avenue, Peterborough, PE1 3XQ
Demolition of existing garages and replace with permeable block paving parking spaces, enclosed with new fencing to boundaries with neighbouring homes
-
26/002397/FUL Granted
Ducati Peterborough Peterborough Road Wansford Peterborough PE8 6JN
Change of use from workshop (B2) to mixed use B2 and Sui Generis (car showroom)
-
26/002836/FUL Status unknown
15 South Parade Peterborough PE3 6BG
13-unit residential development - consisting of 9 flats, 4 maisonettes, and ass
-
26/002499/FUL Refused
Moor Farm House, Moor Road, Milking Nook, Peterborough, PE6 7PQ
Workshop building associated with existing vehicle repair workshop (retrospectiv