Planning application
Etton Water Treatment Works Waterworks Lane Glinton Peterborough
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Exchange of 3 X 2G t-mobile antennas with 3 X 2G/3G t-mobile antennas in the same positions on the existing mast, and the addition of an equipment cabinet within the existing shared equipment cabin
As published by the council, reference 09/00671/NDMTEL
Application record
- Reference
- 09/00671/NDMTEL
- Type
- Notification deminimus Telecommunication
- Status
- Permitted
- Decision
- Granted As published: Permitted - NTEL app. PCC intervened
- Received
- 19 Jun 2009
- Validated
- 19 Jun 2009
- Decided
- 13 Jul 2009
- Ward
- Northborough
- Parish
- Etton
- Decision by
- Delegated Decision (Officer)
Timeline
Dates from the published record
-
19 Jun 2009
Received by Peterborough
-
13 Jul 2009
Decision issued: Permitted - NTEL app. PCC intervened
-
6 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Peterborough granted permission on 13 July 2009, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About telecoms applications
Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Anglian Water Etton Treatment Works Waterworks Lane Glinton Peterborough
Permanent use of existing office building as a training centre for Anglian Water staff, and offices for staff working on Anglian Water's capital construction programme
Granted Full applications 5 docs -
1 Water Board Houses Waterworks Lane Glinton Peterborough PE6 7LP
Change of use from office space to residential
Withdrawn Full applications 11 docs -
1 Water Board Houses Waterworks Lane Glinton Peterborough PE6 7LP
Change of use from office space to residential
Granted Lawful development 8 docs -
Etton Pumping Station Waterworks Lane Glinton Peterborough
Installation of one 505 x 465 x 15mm flat panel antenna
Granted Telecoms 5 docs -
Etton Treatment Works Waterworks Lane Glinton Peterborough PE6 7LP
To install electronic communications apparatus/development ancillary to radio equipment housing on behalf of Telefonica UK Ltd and Cornerstone Telecommunications Infrastructure Limited
Decided Prior approval 2 docs -
Etton Treatment Works Waterworks Lane Glinton Peterborough PE6 7LP
Demolition of disused storage building comprising single span steel frame with pitched roof clad in asbestos sheeting
Decided Prior approval Demolition 7 docs
Other telecoms applications
In Peterborough
-
14/00163/NDMTEL Granted
Communication Station Site PE0017 Sturrock Way Bretton Peterborough
Replace three antennas and install cabinet
-
14/00124/NDMTEL Granted
Communication Station Site 55210 Gunthorpe Road Newborough Peterborough
One 1.8m dish antenna at 5m on 40m tower
-
14/00175/NDMTEL Granted
Footpath Corner Of Eagle Way And Chaffinch Lane Hampton Vale Peterborough
Installation of one DSLAM equipment cabinet
-
13/01382/NDMTEL Granted
Street Record Silver Hill Hampton Centre Peterborough
Notice to install electronic communication apparatus
-
12/01121/NDMTEL Granted
Street Record West Lake Avenue Hampton Vale Peterborough
Notice to install electronic communications apparatus