Planning application
Edith Cavell Hospital Bretton Gate Bretton Peterborough PE3 9GZ
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing hospital buildings and the erection of a new acute hospital building including emergency care facilities, diagnostic and treatment centre, woman and child unit, cancer centre, associated in-patient facilities and energy centre with chimney 40 metres in height. Erection of new mental health unit. Construction of new helipad, decked and surface car parking, site access roads and hard and soft landscaping
As published by the council, reference 05/01269/FUL
Application record
- Reference
- 05/01269/FUL
- Type
- Planning Application (Full)
- Status
- Decided
- Decision
- Granted As published: Permitted
- Received
- 15 Aug 2005
- Validated
- 15 Aug 2005
- Decided
- 3 Mar 2006
- Ward
- West
- Parish
- Bretton
- Decision by
- Committee Decision
- Postcode
- PE3 9GZ
Site history
Applications at this address on the Peterborough register
This site has had 4 applications since 2005: 2 approved, 0 refused.
-
09/01496/NONMAT Decided
Edith Cavell Hospital Bretton Gate Bretton Peterborough PE3 9GZ
Variation of C20 of planning permission 05/01269/FUL dated 03/03/2006 to vary the time frame for a scheme of off-site highway works to be implemented
-
09/00445/DISCHG Decided
Edith Cavell Hospital Bretton Gate Bretton Peterborough PE3 9GZ
Discharge of condition 20 (off site highway works) of planning permission 05/01269/FUL - Demolition of existing hospital buildings and the erection of a new acute hospital building including emergency care facilities, diagnostic and treatment centre, woman and child unit, cancer centre, associated in-patient facilities and energy centre with chimney 40 metres in height. Erection of new mental health unit. Construction of new helipad, decked and surface car parking, site access roads and hard and soft landscaping
-
06/00643/FUL Granted
Edith Cavell Hospital Bretton Gate Bretton Peterborough PE3 9GZ
Construction of energy centre with 32m flue; waste compound; hospital clinical areas; surface car parks adjacent to Cavell Close (SW of site) and decked car park (east of site) - amendments to planning permission 05/01269/FUL
Timeline
Dates from the published record
-
15 Aug 2005
Received by Peterborough
-
3 Mar 2006
Decision issued: Permitted
-
15 Nov 2026
Added to PlanIndex
Documents
304 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Peterborough granted permission on 3 March 2006, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
New Ambulance Station Edith Cavell Hospital Bretton Gate Bretton Peterborough PE3 9GZ
Erection of new ambulance station
Granted Outline 2 docs -
Peterborough City Hospital Bretton Gate Bretton Peterborough PE3 9GZ
Discharge of conditions 4, 7, 8, 10, 13, 18, 20, 24 and 25 of planning permission 05/01269/FUL - Demolition of existing hospital buildings and the erection of a new acute hospital building including emergency care facilities, diagnostic and treatment centre, woman and child unit, cancer centre, associated in-patient facilities and energy centre with chimney 40 metres in height. Erection of new mental health unit. Construction of new helipad, decked and surface car parking, site access roads and hard and soft landscaping as amended by planning permission 06/00643/FUL
Decided Conditions Demolition 116 docs -
Peterborough City Hospital Bretton Gate Bretton Peterborough PE3 9GZ
Discharge of Condition C10 (Landscaping CHANGE TO MHU FENCE HEIGHT ONLY, NO OTHER ALTERATIONS) of Planning Permission 05/01269/FUL - Demolition of existing hospital buildings and the erection of a new acute hospital building including emergency care facilities, diagnostic and treatment centre, woman and child unit, cancer centre, associated in-patient facilities and energy centre with chimney 40 metres in height. Erection of new mental health unit. Construction of new helipad, decked and surface car parking, site access roads and hard and soft landscaping
Decided Conditions Demolition 4 docsSmall domestic -
Peterborough City Hospital Bretton Gate Bretton Peterborough PE3 9GZ
Discharge of planning condition C8 (Surface Water Drainage Scheme) of planning permission 14/00155/FUL - Single storey extension to existing Radiotherapy unit and rooftop plant room, with associated amendment to existing parking, roadways, paths and cycle storage
Decided Conditions Extension 10 docsSmall domestic -
Peterborough City Hospital Bretton Gate Bretton Peterborough PE3 9GZ
Discharge of condition C10 ( Landscaping) And C25 ( Ecological Management) of planning permission 05/01269/FUL- Demolition of existing hospital buildings and the erection of a new acute hospital building including emergency care facilities, diagnostic and treatment centre, woman and child unit, cancer centre, associated in-patient facilities and energy centre with chimney 40 metres in height. Erection of new mental health unit. Construction of new helipad, decked and surface car parking, site access roads and hard and soft landscaping as amended by planning permission 06/00643/FUL
Decided Conditions Demolition 33 docs -
Peterborough City Hospital Bretton Gate Bretton Peterborough PE3 9GZ
Discharge of conditions C5 (Cycle parking), C6 (CCTV), C7 (Door access control), C9 (Noise) of Planning Permission 14/00155/FUL - Single storey extension to existing Radiotherapy unit and rooftop plant room, with associated amendment to existing parking, roadways, paths and cycle storage
Decided Conditions Extension 8 docsSmall domestic
Other full applications
In Peterborough
-
26/002854/FUL Refused
Green Drove Farm, Thorney Dyke, Thorney, PE6 0RG
Change of use of land from agricultural to residential amenity space including new garage
-
26/002999/FUL Withdrawn
Limes Farm, Main Street, Barnack, Stamford, PE9 3DN
Demolition of farm buildings
-
26/002938/FUL Withdrawn
8, Empson Road, Peterborough, PE1 5UP
Change of use from Class B2 (General Industrial) to Class B8 (Storage and Distribution) and siting of 39 storage containers within the external areas of the site
-
26/002730/FUL Granted
Unit 1, The Broadlands, Peterborough, PE1 5GJ
Installation of external vehicle wash bay and new external lighting columns and associated works
-
26/003159/FUL Awaiting decision
709, Lincoln Road, Peterborough, PE1 3HD
Dormer on rear side of roof