Planning application
2 Spen Barn Jinny Lane Roughlee Lancashire BB12 9JN
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Full: Erection of a single storey rear extension and a detached carport.
As published by the council, reference 26/0567/FUL
Application record
- Reference
- 26/0567/FUL
- Type
- Full Application
- Status
- Registered
- Received
- 25 Aug 2026
- Validated
- 1 Sep 2026
- Ward
- Barrowford & Pendleside
- Parish
- Roughlee Booth Parish Council
- Postcode
- BB12 9JN
Comment by 23 September 2026
The council is taking comments on this application until then. Have your say on Pendle's portal.
Timeline
Dates from the published record
-
25 Aug 2026
Received by Pendle
-
1 Sep 2026
Validated
Checked as complete and ready for consideration.
-
3 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Pendle took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Pendle for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
3 Ousel Rock Roughlee Burnley Lancashire BB12 9PS
Full: Demolition of shed and erection of a domestic workshop and landscaping, including groundworks and timber decking.
Granted Full applications Demolition 21 docsSmall domestic -
3 Ousel Rock Roughlee Burnley Lancashire BB12 9PS
Full: Erection of front timber porch and replacement single storey rear extension.
Granted Householder Extension 12 docsSmall domestic -
7 Osborne Terrace Newchurch In Pendle Lancashire BB12 9JJ
Full: Demolition of existing conservatory, erection of single storey rear extension, installation of external flue and rendering the ground floor rear of the property along with the side elevation of the extension (resbmission of Planning Permission 21/0929/HHO).
Granted Householder Extension Demolition 20 docsSmall domestic
Other full applications applications
In Pendle
-
26/0596/FUL Awaiting decision
2 Colne Hall Linden Road Colne Lancashire BB8 9BA
Full: Replacement of windows and doors for flats 1-4.
-
26/0432/FUL Granted
Moor Hall Farm Barnwood Road Earby Lancashire BB18 6LQ
Full: Erection of a covered slurry storage tank.
-
26/0393/FUL Granted
7 - 9 Bridge Street Colne Lancashire
Full: Change of use to subdivide existing 3 dwellings into 7 no. flats (use Class C3) and external alterations.
-
26/0420/FUL Granted
The Barn New Laund Farm Cuckstool Lane Fence Lancashire BB12 9NY
Full: Change of use of an ancillary domestic annexe to a self-contained holiday let.
-
26/0469/FUL Granted
Turney Crook Mews Ivegate Colne Lancashire BB8 9BP
Full: Construction of a paved path and the erection of an associated retaining wall.