Skip to content
PlanIndex Get alerts
Menu

Planning application

Padgett Mill Colbran Street Nelson Lancashire

Awaiting decision Pendle 26/0491/FUL Full Application

Works: Extension Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Full: Part demolition of existing extensions and re-build of extensions, erection of a detached bin store and installation of a sliding gate.

As published by the council, reference 26/0491/FUL

Application record

Reference
26/0491/FUL
Type
Full Application
Status
Registered
Received
24 Jul 2026
Validated
5 Aug 2026
Ward
Bradley
Parish
Nelson Town Council

Timeline

Dates from the published record

  1. 24 Jul 2026

    Received by Pendle

  2. 5 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Pendle took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

29 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Pendle for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 237 Leeds Road Nelson Lancashire BB9 8EJ

    23/0533/FUL Submitted 2 Aug 2023 39m away

    Full: Change of use of ground floor from retail to residential and the erection of a single storey rear extension.

    Granted Full applications Extension 13 docs
    Small domestic
  • 237 Leeds Road Nelson Lancashire BB9 8EJ

    21/0043/FUL Submitted 26 Jan 2021 40m away

    Full: Change of use from a shop (Use Class E) to hot food takeaway (Sui Generis), erection of single storey rear extension and alterations to access for flat above.

    Refused Full applications Extension 20 docs
    Small domestic
  • 28 Reedyford Road Nelson Lancashire BB9 8LN

    22/0365/LHE Submitted 6 Jun 2022 45m away

    Permitted Development Notification (Larger Home Extension): Erection of single storey extension to rear.

    Granted Extension 10 docs
    Small domestic
  • 262 Leeds Road Nelson Lancashire BB9 8EW

    21/0157/HHO Submitted 2 Mar 2021 74m away

    Full: Single storey rear extension and the erection of dormers to the front and rear main roof slopes

    Granted Householder Extension Loft or dormer 12 docs
    Small domestic
  • 9 Eagle Street Nelson Lancashire BB9 8HQ

    22/0095/HHO Submitted 14 Feb 2022 92m away

    Full: Insertion of dormer windows to front and rear roofslopes and removal of chimney.

    Granted Householder Loft or dormer Windows or glazing 15 docs
    Domestic
  • 265 Leeds Road Nelson Lancashire BB9 8EJ

    22/0605/FUL Submitted 6 Sep 2022 96m away

    Full: Change of use of ground floor (Use Class E) to one bed flat (Use Class C3) (retrospective).

    Granted Full applications 18 docs

In Pendle

  • 26/0596/FUL Awaiting decision

    2 Colne Hall Linden Road Colne Lancashire BB8 9BA

    Full: Replacement of windows and doors for flats 1-4.

    2 Sep 2026 Full applications
  • 26/0432/FUL Granted

    Moor Hall Farm Barnwood Road Earby Lancashire BB18 6LQ

    Full: Erection of a covered slurry storage tank.

    30 Jun 2026 Full applications
  • 26/0393/FUL Granted

    7 - 9 Bridge Street Colne Lancashire

    Full: Change of use to subdivide existing 3 dwellings into 7 no. flats (use Class C3) and external alterations.

    16 Jun 2026 Full applications
  • 26/0420/FUL Granted

    The Barn New Laund Farm Cuckstool Lane Fence Lancashire BB12 9NY

    Full: Change of use of an ancillary domestic annexe to a self-contained holiday let.

    24 Jun 2026 Full applications
  • 26/0469/FUL Granted

    Turney Crook Mews Ivegate Colne Lancashire BB8 9BP

    Full: Construction of a paved path and the erection of an associated retaining wall.

    15 Jul 2026 Full applications