Skip to content
PlanIndex Get alerts
Menu

Planning application

146 - 148 Chapel Street Nelson Lancashire BB9 8EA

Granted Pendle 26/0271/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Full: Subdivision of property into two self contained dwellings.

As published by the council, reference 26/0271/FUL

Application record

Reference
26/0271/FUL
Type
Full Application
Status
Decided
Decision
Approved with Conditions
Received
29 Apr 2026
Validated
29 Apr 2026
Decided
15 Jun 2026
Ward
Bradley
Parish
Nelson Town Council
Decision by
Delegated Decision
Postcode
BB9 8EA

Timeline

Dates from the published record

  1. 29 Apr 2026

    Received by Pendle

  2. 15 Jun 2026

    Decision issued: Approved with Conditions

  3. 27 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Manchester

134 applications on PlanIndex · across 20 councils · 74% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 150 Chapel Street Nelson Lancashire BB9 8EA

    21/0309/HHO Submitted 12 Apr 2021 5m away

    Full: Erection of a single storey extension to the rear.

    Granted Householder Extension 15 docs
    Small domestic
  • Former 156 To 158 Leeds Road Nelson Lancashire BB9 9XW

    26/0263/FUL Submitted 27 Apr 2026 29m away

    Full: Subdivision of property into two separate dwellings.

    Granted Full applications 14 docs
  • St Philips Church Leeds Road Nelson Lancashire BB9 9XB

    26/0179/FUL Submitted 23 Mar 2026 58m away

    Full: Change of use of land within the curtilage of the Church (Use Class F1) for the siting of 1 shipping container for use as a food bank (Sui Generis) and 2 accommodation pods for homeless people (Sui Generis).

    Refused Full applications 33 docs
  • 142 Leeds Road Nelson Lancashire BB9 9XB

    22/0462/HHO Submitted 6 Jul 2022 102m away

    Full: Erection of single storey extension to the rear.

    Granted Householder Extension 13 docs
    Small domestic
  • 183 Leeds Road Nelson Lancashire BB9 8EQ

    22/0456/HHO Submitted 5 Jul 2022 117m away

    Full: Insert dormer windows to front and rear roof slopes.

    Granted Householder Loft or dormer Windows or glazing 27 docs
    Domestic
  • Land At Branch Street Nelson Lancashire

    24/0071/FUL Submitted 2 Feb 2024 139m away

    Full: Change of use from open space to form additional car spaces for adjacent car sales lot.

    Granted Full applications 24 docs

In Pendle

  • 26/0596/FUL Awaiting decision

    2 Colne Hall Linden Road Colne Lancashire BB8 9BA

    Full: Replacement of windows and doors for flats 1-4.

    2 Sep 2026 Full applications
  • 26/0432/FUL Granted

    Moor Hall Farm Barnwood Road Earby Lancashire BB18 6LQ

    Full: Erection of a covered slurry storage tank.

    30 Jun 2026 Full applications
  • 26/0393/FUL Granted

    7 - 9 Bridge Street Colne Lancashire

    Full: Change of use to subdivide existing 3 dwellings into 7 no. flats (use Class C3) and external alterations.

    16 Jun 2026 Full applications
  • 26/0420/FUL Granted

    The Barn New Laund Farm Cuckstool Lane Fence Lancashire BB12 9NY

    Full: Change of use of an ancillary domestic annexe to a self-contained holiday let.

    24 Jun 2026 Full applications
  • 26/0469/FUL Granted

    Turney Crook Mews Ivegate Colne Lancashire BB8 9BP

    Full: Construction of a paved path and the erection of an associated retaining wall.

    15 Jul 2026 Full applications