Planning application
209 Leeds Road Nelson Lancashire BB9 8EH
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Full: Change of use on first and second floor from 1 no. dwelling to 2 no. flats.
As published by the council, reference 24/0696/FUL
Application record
- Reference
- 24/0696/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Approved with Conditions
- Received
- 9 Oct 2024
- Validated
- 23 Oct 2024
- Decided
- 5 Dec 2024
- Ward
- Bradley
- Parish
- Nelson Town Council
- Decision by
- Delegated Decision
- Postcode
- BB9 8EH
Timeline
Dates from the published record
-
9 Oct 2024
Received by Pendle
-
23 Oct 2024
Validated
Checked as complete and ready for consideration.
-
5 Dec 2024
Decision issued: Approved with Conditions
-
18 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Burnley
82 applications on PlanIndex · across 6 councils · 86% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
10 Newport Street Nelson Lancashire BB9 7RW
Full: Insertion of dormer window to the front roofslope.
Granted Householder Loft or dormer Windows or glazing 14 docsDomestic -
127 Bankhouse Road Nelson Lancashire BB9 7RB
Full: Insertion of dormer to the front and rear roof slopes.
Granted Householder Loft or dormer 11 docsDomestic -
22 Newport Street Nelson Lancashire BB9 7RW
Full: Erection of a single storey rear extension.
Granted Householder Extension 13 docsSmall domestic -
17 Newport Street Nelson Lancashire BB9 7RW
Full: Erection of dormers to front and rear roof slopes and a single storey rear extension.
Granted Householder Extension Loft or dormer 14 docsSmall domestic -
22 Newport Street Nelson Lancashire BB9 7RW
Full: Erection of a single storey rear extension.
Granted Householder Extension 13 docsSmall domestic -
193 Leeds Road Nelson Lancashire BB9 8EQ
87% historically approved · decision due ~31 Jul
Full: Erection of dormer window to front roof slope, removal of existing rear dormer window and erection of a replacement dormer window to rear roof slope.
Awaiting decision Householder Loft or dormer Windows or glazing 10 docsDomestic
Other full applications applications
In Pendle
-
26/0596/FUL Awaiting decision
2 Colne Hall Linden Road Colne Lancashire BB8 9BA
Full: Replacement of windows and doors for flats 1-4.
-
26/0432/FUL Granted
Moor Hall Farm Barnwood Road Earby Lancashire BB18 6LQ
Full: Erection of a covered slurry storage tank.
-
26/0393/FUL Granted
7 - 9 Bridge Street Colne Lancashire
Full: Change of use to subdivide existing 3 dwellings into 7 no. flats (use Class C3) and external alterations.
-
26/0420/FUL Granted
The Barn New Laund Farm Cuckstool Lane Fence Lancashire BB12 9NY
Full: Change of use of an ancillary domestic annexe to a self-contained holiday let.
-
26/0469/FUL Granted
Turney Crook Mews Ivegate Colne Lancashire BB8 9BP
Full: Construction of a paved path and the erection of an associated retaining wall.