Planning application
Park Primary School Rutland Street Colne Lancashire BB8 0QJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Full: Removal of existing outdoor structure and installation of a new modular building, external lift access and 3 no. air conditioning units
As published by the council, reference 24/0233/FUL
Application record
- Reference
- 24/0233/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Approved with Conditions
- Received
- 9 Apr 2024
- Validated
- 17 Apr 2024
- Decided
- 31 May 2024
- Ward
- Waterside & Horsfield
- Parish
- Colne Town Council
- Decision by
- Delegated Decision
- Postcode
- BB8 0QJ
Timeline
Dates from the published record
-
9 Apr 2024
Received by Pendle
-
17 Apr 2024
Validated
Checked as complete and ready for consideration.
-
31 May 2024
Decision issued: Approved with Conditions
-
7 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a surveying firm
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
30 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Park Primary School Rutland Street Colne Lancashire BB8 0QJ
Certificate of Lawful Use (S.192 Proposed Development): Erection of a modular classroom building.
Decided Lawful development 8 docs -
5 York Street Colne Lancashire BB8 0ND
Full: Demolition of existing single storey outrigger and outhouse and the erection of a single storey rear extension.
Granted Householder Extension Demolition 14 docsSmall domestic -
34 Granville Street Colne Lancashire BB8 0NB
Full: Erection of a single storey rear extension.
Granted Householder Extension 15 docsSmall domestic -
Cemetery Lodge Keighley Road Colne Lancashire BB8 0PH
Full: Change of use of part of the cemetery lawned area to domestic garden, including proposed boundary treatments comprising a stone wall, fencing and gates.
Granted Full applications 33 docs -
117 Keighley Road Colne Lancashire BB8 0QG
Emergency works to a tree subject to T.P.O. No. 2 1980.
Granted Trees 3 docs -
Craven Garage Norfolk Street Colne Lancashire BB8 9JH
Advertisement Consent: Display of 1 no. fascia sign.
Granted Advertising 16 docs
Other full applications applications
In Pendle
-
26/0596/FUL Awaiting decision
2 Colne Hall Linden Road Colne Lancashire BB8 9BA
Full: Replacement of windows and doors for flats 1-4.
-
26/0432/FUL Granted
Moor Hall Farm Barnwood Road Earby Lancashire BB18 6LQ
Full: Erection of a covered slurry storage tank.
-
26/0393/FUL Granted
7 - 9 Bridge Street Colne Lancashire
Full: Change of use to subdivide existing 3 dwellings into 7 no. flats (use Class C3) and external alterations.
-
26/0420/FUL Granted
The Barn New Laund Farm Cuckstool Lane Fence Lancashire BB12 9NY
Full: Change of use of an ancillary domestic annexe to a self-contained holiday let.
-
26/0469/FUL Granted
Turney Crook Mews Ivegate Colne Lancashire BB8 9BP
Full: Construction of a paved path and the erection of an associated retaining wall.