Planning application
Land To The North West Of Letcliffe House Manchester Road Barnoldswick Lancashire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Full: Proposed access and driveway to serve existing dwelling.
As published by the council, reference 24/0009/FUL
Application record
- Reference
- 24/0009/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Approved with Conditions
- Received
- 8 Jan 2024
- Validated
- 18 Jan 2024
- Decided
- 6 Mar 2024
- Ward
- Barnoldswick
- Parish
- Barnoldswick Town Council
- Decision by
- Committee West Craven
Timeline
Dates from the published record
-
8 Jan 2024
Received by Pendle
-
18 Jan 2024
Validated
Checked as complete and ready for consideration.
-
6 Mar 2024
Decision issued: Approved with Conditions
-
7 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Burnley
87 applications on PlanIndex · across 6 councils · 71% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land To The North West Of Letcliffe House Manchester Road Barnoldswick Lancashire
Full: Erection of 1 no. detached dwelling with altered vehicular access and associated parking.
Granted Full applications New dwelling 29 docsDomestic -
Letcliffe Manchester Road Barnoldswick Lancashire BB18 5HE
Lime - Remove due to damage to wall.
Granted Trees 3 docs -
1 Letcliffe Manchester Road Barnoldswick Lancashire BB18 5HE
Remove Sorbus due to cavitity and proximity to Manchester Road
Granted Trees 2 docs -
1 Letcliffe Manchester Road Barnoldswick Lancashire BB18 5HE
Full: Demolition of existing outbuildings and erection of a two storey garage with an office to the first floor.
Granted Householder Demolition 52 docsDomestic -
Letcliffe Garages Manchester Road Barnoldswick Lancashire
Approval of Details Reserved by Condition: Discharge Condition 3 (External Materials), Condition 4 (External Materials for stone), Condition 5 (Foul and Surface Water Drainage), Condition 6 (Foul and Surface Water drained on separate systems), (Condition 8 (Construction of Site Access), Condition 11 (Construction Method Statement) and Condition 16 (Landscaping Scheme) of Planning Permission 23/0320/TDC.
Decided Conditions 32 docs -
Land In Field 7366 Manchester Road Barnoldswick Lancashire
Technical details application: Erection of one dwelling and detached garage and the removal of existing garages and stables of Planning Permission 22/0697/PIP.
Granted 31 docsDomestic
Other full applications applications
In Pendle
-
26/0596/FUL Awaiting decision
2 Colne Hall Linden Road Colne Lancashire BB8 9BA
Full: Replacement of windows and doors for flats 1-4.
-
26/0432/FUL Granted
Moor Hall Farm Barnwood Road Earby Lancashire BB18 6LQ
Full: Erection of a covered slurry storage tank.
-
26/0393/FUL Granted
7 - 9 Bridge Street Colne Lancashire
Full: Change of use to subdivide existing 3 dwellings into 7 no. flats (use Class C3) and external alterations.
-
26/0420/FUL Granted
The Barn New Laund Farm Cuckstool Lane Fence Lancashire BB12 9NY
Full: Change of use of an ancillary domestic annexe to a self-contained holiday let.
-
26/0469/FUL Granted
Turney Crook Mews Ivegate Colne Lancashire BB8 9BP
Full: Construction of a paved path and the erection of an associated retaining wall.