Skip to content
PlanIndex Get alerts
Menu

Planning application

Retaining Wall And Gardens Adjacent To 4 To 10 Peter Birtwistle Close Colne Lancashire

Granted Pendle 24/0008/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Full: Partial rebuilding and associated remedial works to retaining walls.

As published by the council, reference 24/0008/FUL

Application record

Reference
24/0008/FUL
Type
Full Application
Status
Decided
Decision
Approved with Conditions
Received
8 Jan 2024
Validated
8 Jan 2024
Decided
8 Mar 2024
Ward
Waterside & Horsfield
Parish
Colne Town Council
Decision by
Committee Colne

Timeline

Dates from the published record

  1. 8 Jan 2024

    Received by Pendle

  2. 8 Mar 2024

    Decision issued: Approved with Conditions

  3. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 18 Keighley Road Colne Lancashire BB8 0JL

    24/0505/HHO Submitted 29 Jul 2024 41m away

    Full: Conversion and alteration of existing outbuilding to form ancillary accommodation, driveway and access.

    Refused Householder 24 docs
    Small domestic
  • 13A Keighley Road Colne Lancashire BB8 0LP

    23/0705/FUL Submitted 24 Oct 2023 109m away

    Full: Change of use of upper floor(s) from 1 no. flat to 2 no. flats.

    Granted Full applications New dwelling 22 docs
    Domestic
  • 4 Carry Field Colne Lancashire BB8 0AR

    22/0545/HHO Submitted 12 Aug 2022 131m away

    Full: Convert single integral garage to habitable living accommodation, including removal of garage door and replacment with stone wall and windows.

    Granted Householder Windows or glazing 19 docs
    Domestic
  • Land At Peter Birtwistle Close And Carry Lane Carry Lane Colne Lancashire

    21/0272/CND Submitted 29 Mar 2021 138m away

    Approval of Details Reserved by Condition: Discharge of Condition 4 (Carry Lane boundary treatment) of Planning Permission 16/0139/FUL.

    Refused Conditions 22 docs
  • Ground Floor And Part First Floor Shop 3 - 7 Keighley Road Colne Lancashire BB8 0LP

    26/0351/RTD Submitted 27 May 2026 148m away

    87% historically approved · decision due ~27 Jul

    Prior Approval Notification: Change of use of first floor from an office/store (Use Class E) to 1 no. flat (Use Class C3).

    Awaiting decision Outline 14 docs
    Domestic
  • 7 Skipton Road Colne Lancashire BB8 0NG

    26/0540/FUL Submitted 14 Aug 2026 210m away

    84% historically approved · decision due ~9 Oct

    Full: Replacement of existing timber windows with aluminium windows.

    Awaiting decision Full applications Windows or glazing 14 docs

In Pendle

  • 26/0596/FUL Awaiting decision

    2 Colne Hall Linden Road Colne Lancashire BB8 9BA

    Full: Replacement of windows and doors for flats 1-4.

    2 Sep 2026 Full applications
  • 26/0432/FUL Granted

    Moor Hall Farm Barnwood Road Earby Lancashire BB18 6LQ

    Full: Erection of a covered slurry storage tank.

    30 Jun 2026 Full applications
  • 26/0393/FUL Granted

    7 - 9 Bridge Street Colne Lancashire

    Full: Change of use to subdivide existing 3 dwellings into 7 no. flats (use Class C3) and external alterations.

    16 Jun 2026 Full applications
  • 26/0420/FUL Granted

    The Barn New Laund Farm Cuckstool Lane Fence Lancashire BB12 9NY

    Full: Change of use of an ancillary domestic annexe to a self-contained holiday let.

    24 Jun 2026 Full applications
  • 26/0469/FUL Granted

    Turney Crook Mews Ivegate Colne Lancashire BB8 9BP

    Full: Construction of a paved path and the erection of an associated retaining wall.

    15 Jul 2026 Full applications