Planning application
The Abattoir Junction Street Nelson Lancashire BB8 8LH
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Full: Installation of 2 no. water tanks on existing concrete area in front of engineering building.
As published by the council, reference 23/0746/FUL
Application record
- Reference
- 23/0746/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Approved with Conditions
- Received
- 8 Nov 2023
- Validated
- 30 Nov 2023
- Decided
- 10 Jan 2024
- Ward
- Waterside & Horsfield
- Parish
- Colne Town Council
- Decision by
- Delegated Decision
- Postcode
- BB8 8LH
Timeline
Dates from the published record
-
8 Nov 2023
Received by Pendle
-
30 Nov 2023
Validated
Checked as complete and ready for consideration.
-
10 Jan 2024
Decision issued: Approved with Conditions
-
18 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Leeds
55 applications on PlanIndex · across 20 councils · 96% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
The Abattoir Junction Street Nelson Colne Lancashire BB8 8LH
Full: Erection of storage building.
Granted Full applications 65 docs -
Unit 2 Swinden Retail Park Corporation Street Colne Lancashire BB8 8LU
Certificate of Lawful Use (S.192 Proposed Development): Application to certify that the proposed installation of additional floorspace (Class E) at mezzanine level is lawful.
Decided Lawful development 11 docs -
Stott House 429 - 431 Burnley Road Colne Lancashire BB8 8LA
Full: Erection of a single storey, flat-roof front extension to a funeral parlour.
Granted Full applications Extension 16 docsSmall domestic -
Boundary Mill Gertrude Street Nelson Lancashire BB9 8RS
Full: Replacement lower roof.
Granted Full applications 21 docs -
326 Burnley Road Colne Lancashire BB8 8JN
Advertisement Consent: Display of a 3m x 6m digital poster hoarding replacing an existing 48 sheet poster hoarding.
Granted Advertising 14 docs -
Graham Engineering Ltd Edward Street Nelson Lancashire BB9 8SY
Full: (Major) Re-roof building with Tata Trisomet 120mm Merlin Grey HPS200 Ultra steel sheet roof.
Granted Full applications Roofing 27 docs
Other full applications applications
In Pendle
-
26/0596/FUL Awaiting decision
2 Colne Hall Linden Road Colne Lancashire BB8 9BA
Full: Replacement of windows and doors for flats 1-4.
-
26/0432/FUL Granted
Moor Hall Farm Barnwood Road Earby Lancashire BB18 6LQ
Full: Erection of a covered slurry storage tank.
-
26/0393/FUL Granted
7 - 9 Bridge Street Colne Lancashire
Full: Change of use to subdivide existing 3 dwellings into 7 no. flats (use Class C3) and external alterations.
-
26/0420/FUL Granted
The Barn New Laund Farm Cuckstool Lane Fence Lancashire BB12 9NY
Full: Change of use of an ancillary domestic annexe to a self-contained holiday let.
-
26/0469/FUL Granted
Turney Crook Mews Ivegate Colne Lancashire BB8 9BP
Full: Construction of a paved path and the erection of an associated retaining wall.