Planning application
10A Manchester Road Nelson Lancashire BB9 7EG
Works: Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Full: Change of Use of Second & Third Floor to a Self-Contained Flat with a Dormer to the Rear Roof Slope.
As published by the council, reference 23/0098/FUL
Application record
- Reference
- 23/0098/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Approved with Conditions
- Received
- 14 Feb 2023
- Validated
- 14 Feb 2023
- Decided
- 11 Apr 2023
- Ward
- Bradley
- Parish
- Nelson Town Council
- Decision by
- Delegated Decision
- Postcode
- BB9 7EG
Timeline
Dates from the published record
-
14 Feb 2023
Received by Pendle
-
11 Apr 2023
Decision issued: Approved with Conditions
-
14 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
22 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
10A Manchester Road Nelson Lancashire BB9 7EG
Full: Erection of replacement windows.
Refused Full applications Windows or glazing 20 docs -
10A Manchester Road Nelson Lancashire BB9 7EG
Full: Replacement of windows to all elevations.
Refused Full applications Windows or glazing 25 docs -
12 Manchester Road Nelson Lancashire BB9 7EG
Advertisement Consent: Display of 1 no. digital media screen.
Granted Advertising 15 docs -
8 Manchester Road Nelson Lancashire BB9 7EG
Full: Change of use of upper floors to create 2 no. dwellings.
Granted Full applications 21 docsSeveral homes -
2A - 6 Manchester Road Nelson Lancashire
Full: Erection of a single storey rear extension to 4-6 Manchester Rd and enclosure to rear yard to form additional shop floor area at 2A.
Granted Full applications Extension 17 docsSmall domestic -
Kiosk Pendle Rise Shopping Centre Manchester Road Nelson Lancashire BB9 8ET
Full: External cladding to frontage and windows to be painted black.
Granted Full applications Windows or glazing 15 docs
Other full applications applications
In Pendle
-
26/0596/FUL Awaiting decision
2 Colne Hall Linden Road Colne Lancashire BB8 9BA
Full: Replacement of windows and doors for flats 1-4.
-
26/0432/FUL Granted
Moor Hall Farm Barnwood Road Earby Lancashire BB18 6LQ
Full: Erection of a covered slurry storage tank.
-
26/0393/FUL Granted
7 - 9 Bridge Street Colne Lancashire
Full: Change of use to subdivide existing 3 dwellings into 7 no. flats (use Class C3) and external alterations.
-
26/0420/FUL Granted
The Barn New Laund Farm Cuckstool Lane Fence Lancashire BB12 9NY
Full: Change of use of an ancillary domestic annexe to a self-contained holiday let.
-
26/0469/FUL Granted
Turney Crook Mews Ivegate Colne Lancashire BB8 9BP
Full: Construction of a paved path and the erection of an associated retaining wall.