Planning application
Field Number 3565 Lane Top Winewall Lancashire
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Full: Construction of stable block comprising of tack room and feed store.
As published by the council, reference 22/0780/FUL
Application record
- Reference
- 22/0780/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Refuse
- Received
- 14 Nov 2022
- Validated
- 14 Nov 2022
- Decided
- 6 Jan 2023
- Ward
- Boulsworth & Foulridge
- Parish
- Trawden Forest Parish Council
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
14 Nov 2022
Received by Pendle
-
6 Jan 2023
Decision issued: Refuse
-
3 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Bolton
100 applications on PlanIndex · across 14 councils · 80% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Field Number 3565 Lane Top Winewall Lancashire
Full: Formation of an outdoor riding arena with timber post and rail fencing.
Decided Full applications 17 docs -
Field Number 3565 Lane Top Winewall Lancashire
Full: Construction of a stable block, tack room and feed store and change of use of land to equestrian use.
Granted Full applications 31 docs -
Field Number 3565 Lane Top Winewall Lancashire
Approval of Details Reserved by Condition: Discharge Condition 5 (Manure storage) of Planning Permission 23/0481/FUL.
Decided Conditions 8 docs -
35-37 New Row Winewall Colne Lancashire BB8 8BS
Non-Material Amendment: Removal of a window from first storey of rear elevation, additional window and roof light to rear extension and removal of gable above patio door of Planning Permission 23/0100/HHO.
Granted Amendments Extension Loft or dormer +1 5 docs -
35 - 37 New Row Winewall Lancashire BB8 8BS
Variation of Condition: Vary Condition 2 (Plans) of Planning Permission 23/0100/HHO.
Refused Amendments 15 docs -
Other full applications applications
In Pendle
-
26/0596/FUL Awaiting decision
2 Colne Hall Linden Road Colne Lancashire BB8 9BA
Full: Replacement of windows and doors for flats 1-4.
-
26/0432/FUL Granted
Moor Hall Farm Barnwood Road Earby Lancashire BB18 6LQ
Full: Erection of a covered slurry storage tank.
-
26/0393/FUL Granted
7 - 9 Bridge Street Colne Lancashire
Full: Change of use to subdivide existing 3 dwellings into 7 no. flats (use Class C3) and external alterations.
-
26/0420/FUL Granted
The Barn New Laund Farm Cuckstool Lane Fence Lancashire BB12 9NY
Full: Change of use of an ancillary domestic annexe to a self-contained holiday let.
-
26/0469/FUL Granted
Turney Crook Mews Ivegate Colne Lancashire BB8 9BP
Full: Construction of a paved path and the erection of an associated retaining wall.