Skip to content
PlanIndex Get alerts
Menu

Planning application

265 Leeds Road Nelson Lancashire BB9 8EJ

Granted Pendle 22/0605/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Full: Change of use of ground floor (Use Class E) to one bed flat (Use Class C3) (retrospective).

As published by the council, reference 22/0605/FUL

Application record

Reference
22/0605/FUL
Type
Full Application
Status
Decided
Decision
Approved with Conditions
Received
6 Sep 2022
Validated
6 Sep 2022
Decided
18 Nov 2022
Ward
Bradley
Parish
Nelson Town Council
Postcode
BB9 8EJ

Timeline

Dates from the published record

  1. 6 Sep 2022

    Received by Pendle

  2. 18 Nov 2022

    Decision issued: Approved with Conditions

  3. 3 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

23 applications on PlanIndex · across 3 councils · 70% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 262 Leeds Road Nelson Lancashire BB9 8EW

    21/0157/HHO Submitted 2 Mar 2021 61m away

    Full: Single storey rear extension and the erection of dormers to the front and rear main roof slopes

    Granted Householder Extension Loft or dormer 12 docs
    Small domestic
  • 9 Eagle Street Nelson Lancashire BB9 8HQ

    22/0095/HHO Submitted 14 Feb 2022 82m away

    Full: Insertion of dormer windows to front and rear roofslopes and removal of chimney.

    Granted Householder Loft or dormer Windows or glazing 15 docs
    Domestic
  • 1 Juno Street Nelson Lancashire BB9 8RH

    23/0093/HHO Submitted 10 Feb 2023 89m away

    Full: Demolition of existing kitchen and the erection of a new kitchen with a first floor bedroom extension.

    Granted Householder Extension Demolition 20 docs
    Domestic
  • 237 Leeds Road Nelson Lancashire BB9 8EJ

    23/0533/FUL Submitted 2 Aug 2023 94m away

    Full: Change of use of ground floor from retail to residential and the erection of a single storey rear extension.

    Granted Full applications Extension 13 docs
    Small domestic
  • 237 Leeds Road Nelson Lancashire BB9 8EJ

    21/0043/FUL Submitted 26 Jan 2021 94m away

    Full: Change of use from a shop (Use Class E) to hot food takeaway (Sui Generis), erection of single storey rear extension and alterations to access for flat above.

    Refused Full applications Extension 20 docs
    Small domestic
  • Padgett Mill Colbran Street Nelson Lancashire

    26/0491/FUL Submitted 24 Jul 2026 96m away

    84% historically approved · decision due ~30 Sep

    Full: Part demolition of existing extensions and re-build of extensions, erection of a detached bin store and installation of a sliding gate.

    Awaiting decision Full applications Extension Demolition 29 docs

In Pendle

  • 26/0596/FUL Awaiting decision

    2 Colne Hall Linden Road Colne Lancashire BB8 9BA

    Full: Replacement of windows and doors for flats 1-4.

    2 Sep 2026 Full applications
  • 26/0432/FUL Granted

    Moor Hall Farm Barnwood Road Earby Lancashire BB18 6LQ

    Full: Erection of a covered slurry storage tank.

    30 Jun 2026 Full applications
  • 26/0393/FUL Granted

    7 - 9 Bridge Street Colne Lancashire

    Full: Change of use to subdivide existing 3 dwellings into 7 no. flats (use Class C3) and external alterations.

    16 Jun 2026 Full applications
  • 26/0420/FUL Granted

    The Barn New Laund Farm Cuckstool Lane Fence Lancashire BB12 9NY

    Full: Change of use of an ancillary domestic annexe to a self-contained holiday let.

    24 Jun 2026 Full applications
  • 26/0469/FUL Granted

    Turney Crook Mews Ivegate Colne Lancashire BB8 9BP

    Full: Construction of a paved path and the erection of an associated retaining wall.

    15 Jul 2026 Full applications