Skip to content
PlanIndex Get alerts
Menu

Planning application

25/1089/OL

Little Honeyborough, Llanstadwell, Neyland, SA73 1QU

Granted Pembrokeshire OHL

Proposal

As part of our core commitments as a distribution network operator we aim to provide an efficient, safe and reliable electricity supply to our customers. We are due to re-conductor the main line which originates from Neyland primary and links into a line at Houghton, this is maninly due to due to increases in demand on our network. The line diversion as shown in the attached plan is required as there is too much of a heavy angle on the current design. As part of the new design poles will need to be replaced and new ones installed as shown from points B to G in the attached plan.

As published by the council, reference 25/1089/OL

Timeline

Dates from the published record

  1. 18 Mar 2026

    Received by Pembrokeshire

  2. 26 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 20 May 2026

    Decision issued: No Objection

  4. 28 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

In Pembrokeshire

  • 26/0049/CL Granted

    Tesco Superstore, London Road, Pembroke Dock, Pembrokeshire, SA72 6DS

    Installation of solar panels

    23 Apr 2026 Outline
  • 26/0252/PA Awaiting decision

    C3068 Cligerran to Tyrhos Farm, Cligerran, Cardigan, SA43 2TH

    Erection of a dwelling

    7 Jul 2026 Outline
  • 26/0216/PA Awaiting decision

    Land Rear of Wyncote, Dale Road, Haverfordwest, Pembrokeshire, SA61 1HZ

    Outline application (Access considered) for the erection of single detached dwelling and alteration of existing access and drive onto Haven Road - Re-submission following refusal of 25/1097/PA

    25 Jun 2026 Outline
  • 26/0215/PA Awaiting decision

    Land adj Westaways, Station Road, Kilgetty, SA68 0XS

    Residential development (all matters reserved)

    24 Jun 2026 Outline
  • 26/0231/SC Awaiting decision

    Land at Good Hook Farm, Haverfordwest,, Pembrokeshire

    Proposed Construction of an Anaerobic Digestion Plant and Associated Infrastructure

    22 Jun 2026 Outline