Planning application
Gate 4, The Dock Yard, Pembroke Dock, SA72 6TE
Relates to 22/0122/PA
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Fencing and landscaping details required of condition 2 of Reserved Matters Consent ref. 22/0122/PA (Approval of Layout, Access, Appearance, Landscaping and Scale, including those details required of conditions 5, 6, 7, 17 and 20, in respect of Phase 2a of outline planning permission ref. 20/0732/PA)
As published by the council, reference 22/1170/DC
Application record
- Reference
- 22/1170/DC
- Type
- Discharge of Conditions
- Status
- Decision Made
- Decision
- Granted As published: Conditionally Approved
- Received
- 23 Mar 2023
- Validated
- 30 Mar 2023
- Decided
- 18 May 2023
- Ward
- Pembroke Dock Market
- Parish
- HT_Pembroke_Dock
- Decision by
- Decision to be made by officer
- Postcode
- SA72 6TE
Timeline
Dates from the published record
-
23 Mar 2023
Received by Pembrokeshire
-
30 Mar 2023
Validated
Checked as complete and ready for consideration.
-
18 May 2023
Decision issued: Conditionally Approved
-
19 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
22/0122/PA Granted
Gate 4, Pembroke Dockyard, Pembroke Dock, SA72 6TE
Approval of Layout, Access, Appearance, Landscaping and Scale in respect of Phase 2a (Reserved Matters of outline planning permission ref.20/0732/PA - Demolition, part demolition and infill, modification of slipways, erection of buildings and ancillary development - for port related activities including the manufacture of marine energy devices, boat manufacture and repair and erection of plant) (including those details required of conditions 5, 6, 7, 17 and 20 of the outline planning permission)
Documents
12 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Pembrokeshire granted permission on 18 May 2023, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Gate 4, THE DOCKYARD, Pembroke Dock, SA72 6TE
Modification of condition 18 (mitigation works in respect of the graving dock caisson, re-use of dock furniture, the former foreman’s office, the Sunderland Hangar Annexes, the Carriage Drive/South East Cluster, and Paddock Wall including an implementation timetable) of Outline Planning Permission ref.20/0732/PA
Granted Amendments 5 docs -
Graving Dock, Pembroke Dockyard, The Dockyard, Pembroke Dock, SA72 6TE
Infill of Graving Dock and removal and restoration of caisson
Granted Heritage and listed buildings Extension 37 docs -
Slipway No 1 and No 2, Pembroke Dockyard, Pembroke Dock, SA72 6TE
Part demolition and modification of slipways at Gate 4, Pembroke Dockyard, The Dockyard, Pembroke Dock
Granted Heritage and listed buildings Demolition 123 docs -
Ferry Terminal, THE DOCKYARD, Pembroke Dock, Pembrokeshire, SA72 6UF
Change of use from Ferry Vehicle Terminal building (Sui Generis) to gymnasium (D
Granted Full applications -
Custom House, Pembroke Dock, Pembrokeshire, SA72 6WT
Internal alterations to create a secure store room.
Granted Heritage and listed buildings 14 docs -
Gate 4, Pembroke Dockyard, The Dockyard, Pembroke Dock, SA72 6TE
Partial Discharge of condition 18 (relating to works to Carriage Drive) of planning permission 20/0732/PA (demolition, part demolition and infill, modification of slipways, erection of buildings and ancillary development - for port related activities … )
Granted Conditions Extension Demolition 12 docs
Other condition discharge and variation applications
In Pembrokeshire
-
26/0433/DC Granted
Land South of Pembroke Power Station, Pembroke, SA71 5TP
Discharge of Conditions 3 (Construction Environment Management Plan) & 4 (Landscaping) of Planning Permission 25/0524/PA (Installation of underground cable)
-
26/0409/DC Split decision
20, Hamilton Terrace, Milford Haven, Pembrokeshire, SA73 3JA
Discharge of conditions 3 (parking details) and 4 (Construction Environmental Management Plan) to planning permission 25/0418/PA (Change of use from redundant restaurant and accommodation to 1 flat and 8 bedsits together with extension and alterations).
-
26/0434/DC Granted
Land East of the Greenlink Converter Station, Off Goldborough Road, Pembroke
Discharge of condition 11 (contamination) of planning permission 23/0857/PA (Installation of a Battery Energy Storage System (BESS), associated infrastructure including a 132kv substation and engineering works to create earth bunds).
-
26/0553/DC Awaiting decision
Fenton Home Farm, CRUNDALE, Haverfordwest, Pembrokeshire, SA62 4PY
Discharge of condition 3 (surface water) of planning permission 24/0754/PA (Proposed agricultural solid muck storage shed).
-
26/0416/DC Split decision
Unit 1, West Estate, WITHYBUSH, Haverfordwest, Pembrokeshire, SA62 4BN
Discharge of Condition 5 (Construction Management Statement) of Planning Permission 25/0496/PA (Extension to an existing gymnasium)