Planning application
26/01389/CPU
20 Sunnyside Oxford Oxfordshire OX4 2NW
Proposal
Application to certify that the proposed removal of the existing conservatory and erection of a single storey mono pitched rear extension is lawful development.
As published by the council, reference 26/01389/CPU
Timeline
Dates from the published record
-
8 Jun 2026
Received by Oxford
-
2 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Oxford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
19/02167/VAR Granted
12 Bleache Place Oxford Oxfordshire OX4 2JD
Variation of condition 2 (Development in accordance with approved plans) of planning permission 18/01180/FUL (Erection of a 1 x 3-bed dwellinghouse (Use Class C3). Erection of a garage, provision of bin and cycle storage.) to allow the garage roof height to be increased.
-
20/00821/CND3 Granted
8A Marshall Road Oxford Oxfordshire OX4 2NR
Details submitted in compliance with conditions 5 (carbon emissions), 6 (soft and hard landscaping), 11 (Suds), 14 (Secured by Design), 15 (scheme of ecological enhancements) and 16 (Mitigation License) of appeal decision 20/00821/FUL. (amended description).
-
19/02516/FUL Granted
8 Marshall Road Oxford OX4 2NR
Change of use from small House of Multiple Occupation (Use Class C4) to large House of Multiple Occupation (Use Class Sui Generis).
-
26/01562/FUL Awaiting decision
14 Marshall Road Oxford Oxfordshire OX4 2NR
Erection of a single storey rear extension. Insertion of 2no. windows to side elevation.
-
19/02556/CPU Refused
2A Marshall Road Oxford OX4 2NR
Application to certify that the proposed loft conversion, insertion of 3no. rooflights to front roofslope, 3no. rooflights to rear roofslope and alterations to windows to front elevation is lawful development.
-
26/01202/FUL Awaiting decision
27 Fern Hill Road Oxford Oxfordshire OX4 2JN
Change of use of dwellinghouse (Use Class C3) to a House in Multiple Occupation (Use Class C4). (retrospective)
Other outline applications
In Oxford
-
26/01347/CPU Granted
32 Monmouth Road Oxford Oxfordshire OX1 4TD
Application to certify that the proposed formation of a rear dormer and insertion of 2no. rooflights to front roof slope is lawful development.
-
26/01230/CPU Granted
61 Bailey Road Oxford Oxfordshire OX4 3HX
Application to certify that the proposed demolition of an existing shed and erection of a timber garden office/studio, extension of an existing concrete base and installation of electrical cable is lawful development. (Amended Description)
-
26/01196/CPU Refused
Folly Bridge Court And 5-8 And 15-18 Shirelake Close Oxford Oxfordshire OX1 1SW
Application to certify that the alterations to fenestration is lawful development.
-
26/01750/CPU Awaiting decision
1 Farndon Road Oxford Oxfordshire OX2 6RS
Application to certify that the proposed installation of 1no. air source heat pump to rear elevation is lawful development.
-
26/01744/CPU Awaiting decision
16 Riverside Road Oxford Oxfordshire OX2 0HU
Application to certify that the proposed alterations to roof to form hip to gable, formation of 1no. rear dormer, and installation of front rooflights in association with loft conversion is lawful development.