52 And 55 High Street Oxford Oxfordshire OX1 4AS

Granted Oxford 22/01311/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of use of 2no retail units (Use Class E(a)) into office space (Use Class E(g)(i)) including the lowering of the basement floor and installation of extraction vent to rear elevation. Installation of 1no. security gates to front elevation of No.52 (amended plans and description)

As published by the council, reference 22/01311/FUL

Application record

Reference
22/01311/FUL
Type
Full Application
Status
Decided
Decision
Approved
Received
27 May 2022
Validated
27 May 2022
Decided
6 Mar 2023
Ward
Holywell Ward
Decision by
Delegated Decision
Postcode
OX1 4AS

Timeline

Dates from the published record

  1. 27 May 2022

    Received by Oxford

  2. 6 Mar 2023

    Decision issued: Approved

  3. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 52 And 55 High Street Oxford Oxfordshire OX1 4AS

    22/01312/LBC Submitted 27 May 2022 0m away

    Conversion of retail unit into office space, refurbishment to include: new gates to the entry recess, damp proofing works to basement to include excavation, replacement of WC and WHB, redecoration, and upgrade to mechanical and electrical services. (Amended)

    Granted Heritage and listed buildings 25 docs
  • 50 High Street Oxford OX1 4AS

    19/02519/FUL Submitted 27 Sep 2019 17m away

    Change of Use from Retail (Use Class A1) to Office (Use Class B1a).

    Granted Full applications 13 docs
  • 49-56 High Street Oxford Oxfordshire OX1 4AP

    20/01020/CND Submitted 3 Sep 2020 25m away

    Details submitted in compliance with conditions 4 (Storage of GF window), 5 (Joinery details - door+window No.50), 7 (New second floor window), 9 (External fixtures - further details), 13 (Internal doors), 14 (Fabric upgrades - further details), 15 (MEP services) of listed building consent 20/01020/LBC

    Granted Conditions Windows or glazing 114 docs
  • 74 High Street Oxford Oxfordshire OX1 4BG

    26/00842/LBC Submitted 2 Apr 2026 31m away

    Proposed internal repairs to include doors, walls, floors, ceilings, cornices, fireplaces, panelling and other decorative timber elements, and structural repairs at basement level. Insertion of a platform lift between basement and first floor levels. Works to improve fire safety including alterations to doors and insertion of fire partitions and curtains. Replacement of MEP services and redecoration throughout. Alterations to internal layout to create new WCs and welfare facilities at basement level. Insertion of a glazed partition and jib door at ground floor level. Installation of new fixed furniture. Removal of modern partitions and mezzanine. Secondary glazing. External repairs to include cleaning and repair of masonry detailing and windows. Roof repairs including replacement slate and leadwork. Alterations to rainwater goods and external drainage. New roof insulation and roof access system. (Revised description).

    Granted Heritage and listed buildings Roofing Windows or glazing 141 docs
  • Eastgate Hotel 73 High Street Oxford Oxfordshire OX1 4BE

    17/00188/NMA Submitted 16 Jul 2019 47m away

    Non-Material Amendment to planning permission 17/00188/FUL to allow removal of the protrusion at the first and second floor to the south-east side elevation.

    Granted Amendments 19 docs
  • Eastgate Hotel 73 High Street Oxford Oxfordshire OX1 4BE

    17/00188/CND3 Submitted 18 Jul 2019 48m away

    Details submitted in compliance with conditions 3 (Samples in Conservation Area), 12 (Secured by Design) and 13 (Sustainable design and construction) of planning permission 17/00188/FUL.

    Granted Conditions 24 docs

In Oxford

  • 26/02081/FUL Awaiting decision

    36 Kennett Road Oxford Oxfordshire OX3 7BJ

    Demolition of rear conservatory and erection of a single storey rear extension.

    27 Aug 2026 Full applications
  • 26/02069/FUL Awaiting decision

    28 Rymers Lane Oxford Oxfordshire OX4 3LB

    Change of use of dwellinghouse (Use Class C3) to a House in Multiple Occupation (Use Class C4). Provision of bin and bike stores.

    26 Aug 2026 Full applications
  • 26/02065/FUL Awaiting decision

    16 Norham Road Oxford Oxfordshire OX2 6SF

    Installation of front gates (Retrospective).

    26 Aug 2026 Full applications
  • 26/02071/FUL Awaiting decision

    The William R Miller Building Dawson Street Oxford Oxfordshire OX4 1GF

    Installation of 38no. of PV panels to existing roof and associated works.

    26 Aug 2026 Full applications
  • 26/02075/FUL Awaiting decision

    Oxford University Press Great Clarendon Street Oxford Oxfordshire OX2 6DP

    Installation of air conditioning units and associated works.

    26 Aug 2026 Full applications