Planning application
27 Park End Street Oxford OX1 1HU
Works: Loft or dormer Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Repair and replacement of existing glazing bars and glazing to roof lights and canopy.
As published by the council, reference 19/02596/LBC
Application record
- Reference
- 19/02596/LBC
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 7 Oct 2019
- Validated
- 11 Oct 2019
- Decided
- 6 Dec 2019
- Ward
- Carfax Ward
- Decision by
- Delegated Decision
- Postcode
- OX1 1HU
Site history
Applications at this address on the Oxford register
This site has had 5 applications since 2019: 4 approved, 0 refused.
-
18/03144/CND Granted
27 Park End Street Oxford OX1 1HU
Details submitted in compliance with condition 4 (External doors & Stairs) and 6 (External plant finish) of planning permission 18/03144/FUL.
-
19/00886/CND Granted
27 Park End Street Oxford OX1 1HU
Details submitted in compliance with condition 3 (Further details - Window stays) of listed building consent 19/00886/LBC
-
19/00886/LBC Granted
27 Park End Street Oxford OX1 1HU
Installation of secondary glazing to all windows. (Amended description).
-
19/00885/FUL Withdrawn
27 Park End Street Oxford OX1 1HU
Formation of secondary glazing to all windows and installation of external lighting.
Timeline
Dates from the published record
-
7 Oct 2019
Received by Oxford
-
11 Oct 2019
Validated
Checked as complete and ready for consideration.
-
6 Dec 2019
Decision issued: Approved
-
2 Aug 2026
Added to PlanIndex
Documents
14 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Oxford granted permission on 6 December 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Ground To Third Floors 27 Park End Street Oxford Oxfordshire
Damp proofing works to the party wall in the server room and the dividing wall between the server room and the meeting room on the ground floor.
Granted Heritage and listed buildings 11 docs -
27 Park End Street Oxford Oxfordshire OX1 1HU
Installation of exterior lighting on the building window edges.
Withdrawn Full applications Windows or glazing 26 docs -
27 Park End Street Oxford Oxfordshire OX1 1HU
External refurbishment and installation of external lighting
Withdrawn Heritage and listed buildings 27 docs -
27 Park End Street Oxford OX1 1HU
Installation of secondary glazing to all windows. (Amended description).
Granted Heritage and listed buildings Windows or glazing 50 docs -
27 Park End Street Oxford OX1 1HU
Formation of secondary glazing to all windows and installation of external lighting.
Withdrawn Full applications Windows or glazing 45 docs -
27 Park End Street Oxford Oxfordshire OX1 1HU
Provision of bin store. Relocation of cycle stores.
Granted Full applications 25 docs
Other heritage and listed building applications
In Oxford
-
26/02124/LBC Granted
1 Rose Lane Oxford Oxfordshire OX1 4DT
The repair and refurbishment of the stone boundary wall fronting Rose Lane
-
26/02147/LBC Granted
Jesus College Turl Street Oxford Oxfordshire OX1 3DW
Repairs and alterations to staircases XVI-XVII as well as stone repairs to Tower. (Amended Description) (Amended Plans)
-
26/02170/LBC Granted
43 St John Street Oxford Oxfordshire OX1 2LH
Replacement of existing vehicular and pedestrian gates and associated works to brick pier.
-
26/01926/LBC Granted
Former Prison Site New Road Oxford Oxfordshire OX1 1ND
Internal alterations including reinstatement of full floor at upper gallery level, and removal of 1no. internal staircase. Installation of fire safety services. External alterations to signage including replacement of 1no. externally illuminated hanging sign, removal of 1no. non-illuminated panel chalkboard and replacement of non-illuminated advertising graphics to balustrade. (Amended description)
-
26/02689/LBC Awaiting decision
Balliol College Broad Street Oxford Oxfordshire OX1 3BJ
Internal alterations include removal of bedrooms to form a pantry to the Beard building, refurbishment to dining hall, buttery and servery. Relocation of lifts, alterations to handrails and lighting. Insertion of accessible WC, replacement of mechanical and electrical services.