Planning application
Headington Hill Campus Oxford Brookes University Headington Hill Oxford OX3 0BT
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Retention of portacabin for teaching purposes for a further temporary period of 3 years. (amended description)
As published by the council, reference 19/02252/FUL
Application record
- Reference
- 19/02252/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 28 Aug 2019
- Validated
- 28 Aug 2019
- Decided
- 15 Oct 2019
- Ward
- Headington Hill And Northway Ward
- Decision by
- Delegated Decision
- Postcode
- OX3 0BT
Timeline
Dates from the published record
-
28 Aug 2019
Received by Oxford
-
15 Oct 2019
Decision issued: Approved
-
2 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Oxford granted permission on 15 October 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Headington Hill Campus Oxford Brookes University Headington Hill Oxford Oxfordshire OX3 0BT
Details submitted in compliance with condition 23 (detailed drainage strategy) of planning permission 22/00679/FUL.
Granted Conditions 30 docs -
Headington Hill Hall Headington Hill Oxford Oxfordshire OX3 0BT
99% historically approved · decision due ~23 Dec
Works to various trees as specified by Boward Tree Surgery (Oxford) Ltd in the Headington Hill Conservation area.
Awaiting decision Trees 2 docs -
Headington Hill Campus Oxford Brookes University Headington Hill Oxford Oxfordshire OX3 0BT
97% historically approved · decision due ~21 Jan
Details submitted in compliance with condition 3 (Materials - samples) of planning permission 25/00631/VAR
Awaiting decision Conditions 9 docs -
Headington Hill Hall Headington Hill Oxford Oxfordshire OX3 0BT
Works to 3no. Yew trees as specified by Mr Michael Boys in Headington Hill Conservation Area.
Granted Trees 5 docs -
Headington Hill Campus Oxford Brookes University Headington Hill Oxford Oxfordshire OX3 0BT
Details submitted in compliance with conditions 2 (recording of wall) and 3 (methodology, materials & specification)of listed building consent 21/01369/LBC
Granted Conditions 4 docs -
Headington Hill Campus Oxford Brookes University Headington Hill Oxford Oxfordshire OX3 0BT
Non-Material amendment to planning permission 22/00679/FUL to allow alterations to external features of the new engineering building.
Granted Amendments 6 docs
Other full applications
In Oxford
-
26/01836/FUL Granted
48 Walton Street Oxford Oxfordshire OX2 6AD
Change of use of ground floor from Financial and Professional Services (Use Class E(c)(i)) to hot food takeaway (Use Class Sui Generis). Installation of extractor ducting and ventilation to the rear elevation, alterations to shopfront and signage.
-
26/01665/FUL Granted
19 Buckler Road Oxford Oxfordshire OX2 7TE
Erection of a first floor rear extension and amalgamation of the ground floor rear extensions. (Amended plans)
-
26/02237/FUL Awaiting decision
54 Howard Street Oxford Oxfordshire OX4 3BE
Erection of single storey extension to rear.
-
26/01769/FUL Refused
7 Frideswide Road Oxford Oxfordshire OX2 8FZ
Installation of garage door (Retrospective).
-
26/02220/FUL Awaiting decision
17A Shelley Close Oxford Oxfordshire OX3 8HB
Replacement of a section of perimeter fencing.