Skip to content
PlanIndex Get alerts
Menu

Planning application

Botanic Gardens High Street Oxford OX1 4AZ

Granted Oxford 18/03298/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of a back-up electricity generator.

As published by the council, reference 18/03298/FUL

Application record

Reference
18/03298/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Approved
Received
17 Dec 2018
Validated
17 Dec 2018
Decided
11 Feb 2019
Ward
Holywell Ward
Decision by
Delegated Decision
Postcode
OX1 4AZ

Site history

Applications at this address on the Oxford register

This site has had 3 applications since 2018: 2 approved, 0 refused.

  • 19/00093/FUL Granted

    Botanic Gardens High Street Oxford OX1 4AZ

    Removal of 2no sheds from the Rose Cottage garden, replacement of fencing. Erection of a new shed on the western part of the site.

    Decided 7 Mar 2019 Full applications
  • 18/03299/LBC Withdrawn

    Botanic Gardens High Street Oxford OX1 4AZ

    Installation of a back-up electricity generator.

    Decided 21 Jan 2019 Heritage and listed buildings

Timeline

Dates from the published record

  1. 17 Dec 2018

    Received by Oxford

  2. 11 Feb 2019

    Decision issued: Approved

  3. 28 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Oxford University Estates Services Agent, a developer

4 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Oxford granted permission on 11 February 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Botanic Gardens High Street Oxford OX1 4AZ

    18/03299/LBC Submitted 17 Dec 2018 50 yards away

    Installation of a back-up electricity generator.

    Withdrawn Heritage and listed buildings 7 docs
  • Playing Fields (Site A) Magdalen College School Cowley Place Oxford Oxfordshire

    26/01421/CAT Submitted 3 Jun 2026 100 yards away

    Works to various trees as specified by ARBUK Limited in the Central conservation area. 065 - Ash, Remove limb described back to union. 074,075, 094, 099, 134 - Repollard 138 - Ash, Remove riverside stem 146 - Gleditzia, Lift lowest tips to clear pavement by 3m

    Granted Trees 3 docs
  • Botanic Gardens High Street Oxford OX1 4AZ

    19/00093/FUL Submitted 14 Jan 2019 100 yards away

    Removal of 2no sheds from the Rose Cottage garden, replacement of fencing. Erection of a new shed on the western part of the site.

    Granted Full applications 15 docs
    Small domestic
  • Rose Cottage Rose Lane Oxford Oxfordshire OX1 4DU

    26/00965/LBC Submitted 20 Apr 2026 100 yards away

    Installation of 1no. wifi access point internally within Reception Room. Associated mounting and cable route from stairs.

    Granted Heritage and listed buildings 7 docs
  • Botanic Garden Rose Lane Oxford Oxfordshire OX1 4DU

    24/02423/ENT Submitted 10 Oct 2024 100 yards away

    Works to 1no. Morus nigra tree as specified by The University Of Oxford Botanic Garden And Arboretum in the Central Conservation Area

    Granted Trees 4 docs
  • Playing Fields (Site B) Magdalen College School Cowley Place Oxford Oxfordshire

    26/01420/CAT Submitted 3 Jun 2026 100 yards away

    Removal of various trees and works to 1no. Lombardy Poplar tree and 1no. Horse Chestnut tree as specified by ARBUK Limited in the Central conservation area. 036 - 5 recently dead trees (Sycamores and a hawthorn) to be removed. 039 - Lombardy Poplar repruned back to the historic pollarding points at approx.10m above ground level. 044 - Horse Chestnut, Crown lift over river to c.4m 051 - Crack Willow the tree is removed entirely. 062 - 4 larch, 3 - 2 of which are now standing dead - both dead trees should be removed.

    Granted Trees 4 docs

In Oxford

  • 26/02458/FUL Awaiting decision

    47 Bedford Street Oxford Oxfordshire OX4 1SU

    Removal of 2no. existing dormers at South East elevation and replaced with 1no. dormer at South east elevation.

    Received 13 Oct, published by the council 19 Oct 2026 Full applications
  • 26/02452/FUL Awaiting decision

    8 Walton Street Oxford Oxfordshire OX1 2HG

    Replacement of rear single storey extension glass roof with a natural slate roof, raising by 125mm and retaining the two rooflights.

    Received 13 Oct, published by the council 19 Oct 2026 Full applications
  • 26/02450/FUL Awaiting decision

    33 Warneford Road Oxford Oxfordshire OX4 1LU

    Change of use of dwellinghouse (Use Class C3) to a House in Multiple Occupation (Use Class C4). Provision of bin and cycle storage.

    Received 12 Oct, published by the council 19 Oct 2026 Full applications
  • 26/02451/FUL Awaiting decision

    5 Stockmore Street Oxford Oxfordshire OX4 1JT

    Change of use of dwellinghouse (Use Class C3) to a House in Multiple Occupation (Use Class C4). Provision of bin and cycle storage.

    Received 12 Oct, published by the council 19 Oct 2026 Full applications
  • 26/01881/FUL Refused

    13 Ashlong Road Oxford Oxfordshire OX3 0NH

    Demolition of existing single storey rear extension. Erection of a part single, part two storey rear extension. Alterations to roof to form hip to gable, formation of 1no. rear dormer and insertion of 2no. front rooflights in association with loft conversion.

    Received 5 Aug, published by the council 24 Aug 2026 Full applications